Brazil

Teles Pires — 1,820 MW Hydroelectric

Hydroelectric Renewable Verified

Teles Pires is a 1,820 MW hydro power plant located in Brazil. View location, capacity, and technical details.

Capacity
1,820 MW

Installed

Commissioned
2015

Year online

Owner
Eletrobras

Operator

Location
-9.34, -56.78

Coordinates

Insights

#21
largest in Brazil
#125
largest Hydroelectric worldwide
#973
largest worldwide
2015
31 yrs newer than avg
63
operated by Eletrobras
4
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
1,820 MW
Commissioned
2015
Status
Operational
Owner
Eletrobras
Country
Brazil
Coordinates
-9.341, -56.777

Estimated Carbon Footprint

Annual CO₂
153,038 t

tonnes / year

Lifetime CO₂
12,243,032 t

over ~80 yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

33,269
cars / year
20,405
homes / year
6,956,268
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

The Teles Pires Hydroelectric Power Plant, located in Brazil, is a significant contributor to the country’s energy sector, boasting a total installed capacity of 1,819.8 megawatts (MW). Commissioned in 2015, this facility plays a crucial role in meeting Brazil’s growing electricity demands while promoting the use of renewable energy sources. Situated on the Teles Pires River, which flows through the states of Mato Grosso and Pará, the plant harnesses the kinetic energy of flowing water to generate electricity, thereby exemplifying Brazil’s commitment to sustainable energy production.

As a hydroelectric power plant, Teles Pires operates by converting the potential energy of water stored in its reservoir into electrical energy through turbines. This method of power generation is considered one of the most efficient and environmentally friendly compared to fossil fuel-based alternatives. The plant’s design incorporates advanced technologies that optimize water flow and turbine efficiency, ensuring minimal energy loss during the conversion process. The hydroelectric system is capable of producing substantial amounts of electricity consistently, making it a reliable source of power for the region.

The environmental impact of the Teles Pires Hydroelectric Power Plant is a topic of both concern and consideration. While hydroelectric power is generally viewed as a cleaner alternative to fossil fuels, the construction of large dams can lead to significant ecological and social changes. The Teles Pires project involved the flooding of vast areas of land, which affected local ecosystems and displaced communities. To mitigate these impacts, the plant’s operators have invested in environmental management programs aimed at preserving biodiversity and supporting local populations. Efforts include reforestation initiatives and compensation for affected communities.

Regionally, Teles Pires serves as a vital energy source not only for the immediate vicinity but also for the broader Brazilian electrical grid. It contributes to the interconnected system that supplies electricity across multiple states, enhancing energy security and stability. The plant’s output supports both residential and industrial consumers, playing a significant role in driving economic development in the region. Additionally, Teles Pires is part of Brazil’s strategy to diversify its energy mix, reducing reliance on fossil fuels and addressing climate change concerns through increased adoption of renewable resources.

In summary, the Teles Pires Hydroelectric Power Plant stands as a pivotal entity within Brazil’s energy framework. Its substantial capacity and renewable fuel source underscore the country’s dedication to sustainable development. While challenges related to environmental and social impacts persist, ongoing efforts to engage with local communities and protect ecosystems demonstrate a commitment to balancing energy needs with environmental stewardship.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.