TERMOELECTRICA MEJILLONES (CTM1) — 319 MW Coal

Coal Verified

TERMOELECTRICA MEJILLONES (CTM1) is a 319 MW coal power plant located in Chile. View location, capacity, and technical details.

Capacity
319 MW

Installed

Commissioned
2014

Year online

Owner
E-CL

Operator

Location
-23.09, -70.41

Coordinates

Insights

#31
largest in Chile
#1,835
largest Coal worldwide
#5,915
largest worldwide
2014
17 yrs newer than avg
5
operated by E-CL
12
plants within 100 km

Technical Details

Fuel Type
Coal
Capacity
319 MW
Commissioned
2014
Status
Operational
Owner
E-CL
Country
Chile
Coordinates
-23.085, -70.410

Estimated Carbon Footprint

Annual CO₂
1,259,897 t

tonnes / year

Lifetime CO₂
50,395,895 t

over ~40 yrs

Intensity
820 g

gCO₂ per kWh

Annual emissions equal to

273,891
cars / year
167,986
homes / year
57,268,062
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

TERMOELECTRICA MEJILLONES (CTM1) stands out as a key coal-fired power generation facility located in Chile, boasting a capacity of 318.9 MW. Operated by E-CL, this plant is an integral part of the country’s energy mix, particularly in the northern region where energy demand is high. Utilizing advanced coal combustion technology, the plant also incorporates petcoke as a secondary fuel, enhancing its operational flexibility and efficiency. The facility is situated at coordinates -23.0854° S latitude and -70.4100° W longitude, strategically positioned to serve the local grid and contribute to the overall energy supply for industrial and residential consumers. In the context of Chile’s energy policy, which faces the challenge of transitioning towards more sustainable sources while ensuring energy security, TERMOELECTRICA MEJILLONES represents a critical component of the current energy framework. While the country increasingly invests in renewable energy, the plant’s capacity remains vital to meet immediate power needs and stabilize the grid during peak demand. As such, this coal and petcoke power generation facility not only underscores the complexities of energy transition in Chile but also highlights the ongoing reliance on fossil fuels within the national energy strategy.