United Kingdom

The Fall of Warness Tidal Scheme (EMEC) — 4 MW Wave and Tidal

Wave and Tidal Verified

The Fall of Warness Tidal Scheme (EMEC) is a 4 MW wave and tidal power plant located in United Kingdom. View location, capacity, and technical details.

Capacity
4 MW

Installed

Commissioned
2018

Year online

Owner
Tocardo/OpenHydro

Operator

Location
59.14, -2.81

Coordinates

Insights

#1,999
largest in United Kingdom
#6
largest Wave and Tidal worldwide
#30,667
largest worldwide
2018
7 yrs newer than avg
1
operated by Tocardo/OpenHydro
39
plants within 100 km

Technical Details

Fuel Type
Wave and Tidal
Capacity
4 MW
Commissioned
2018
Status
Operational
Owner
Tocardo/OpenHydro
Country
United Kingdom
Coordinates
59.140, -2.806

Carbon Footprint

Annual CO₂
179 t

tonnes / year

Lifetime CO₂
4,468 t

over ~25 yrs

Intensity
17 g

Est. gCO2/kWh

Annual emissions equivalent to

39
cars per year
24
homes per year
8,123
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Plants

About this plant

The Fall of Warness Tidal Scheme (EMEC) is a 4 MW wave and tidal power plant in the United Kingdom, operated by Tocardo/OpenHydro.

Ranked #3 of 7 wave and tidal plants in the United Kingdom, it accounts for 10.47% of the country’s total wave and tidal capacity of 38 MW. The largest wave and tidal plant in the United Kingdom is Hayle Wave Hub (Test Site) at 23 MW, making this facility 5.8 times smaller.

Nearby plants within 50 km include Kirkwall (16 MW, Oil), Spurness Extension (10 MW, Wind), and Inner Sound Phase 1A (MeyGen) (6 MW, Wave and Tidal). The facility is located in Orkney, approximately 16 km from Kirkwall.

More Wave and Tidal plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.