Trenche Generating Station is a 302 MW hydro power plant located in Canada. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 302 MW
- Commissioned
- 1950
- Status
- Operational
- Owner
- Hydro-Québec
- Country
- Canada
- Coordinates
- 47.752, -72.878
- Wikipedia
- Link
Estimated Carbon Footprint
tonnes / year
over ~80 yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
Gentilly Nuclear Generating Station
Canada · Nuclear
Bécancour
Canada · Natural Gas
Isle-Maligne
Canada · Hydroelectric
Centrale d'isle Maligne
Canada · Hydroelectric
Bécancour (HQ)
Canada · Natural Gas
Chute-du-Diable
Canada · Hydroelectric
About this plant
Trenche is a key hydro power generation facility located in Canada, boasting a capacity of 302 MW. Operated by Hydro-Québec, this plant plays an essential role in the province’s energy landscape, where hydroelectric power is the dominant source of electricity generation. Utilizing advanced hydroelectric technology, Trenche harnesses the energy from natural water flows to produce clean, renewable energy. The facility is situated at coordinates 47.7521, -72.8783, in a region known for its abundant hydrological resources, making it ideally suited for hydroelectric generation. As Canada continues to prioritize renewable energy, Trenche stands out as a pivotal player in supporting both local and national energy needs. The plant not only contributes to the grid’s stability but also aligns with Canada’s commitment to reducing greenhouse gas emissions and promoting sustainable energy sources. With its operational context firmly rooted in environmental stewardship, Trenche is a testament to Canada’s ongoing efforts to lead in clean energy generation.
More Hydroelectric plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.