BIH

Ugljevik CHP Coal Power Plant Bosnia and Herzegovina — 300 MW Coal

Coal Verified

Ugljevik CHP Coal Power Plant Bosnia and Herzegovina is a 300 MW coal power plant located in Bosnia and Herzegovina. View location, capacity, and technical details.

Capacity
300 MW

Installed

Commissioned
2010

Year online

Owner
Elektroprivreda Republike Srpske

Operator

Location
44.68, 18.97

Coordinates

Insights

#5
largest in %s
#1,851
largest %s worldwide
#6,026
largest worldwide
2010
%d yrs newer than avg
3
operated by %s
5
plants within 100 km

Technical Details

Fuel Type
Coal
Capacity
300 MW
Commissioned
2010
Status
Operational
Owner
Elektroprivreda Republike Srpske
Country
BIH
Coordinates
44.683, 18.967

Estimated Carbon Footprint

Annual CO₂
1.2M t

tonnes / year

Lifetime CO₂
47.4M t

over ~%d yrs

Intensity
820 g

gCO₂ per kWh

Annual emissions equal to

257,658
cars / year
158,030
homes / year
53.9M
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

The Ugljevik CHP Coal Power Plant, situated in Bosnia and Herzegovina at coordinates 44.6829, 18.9671, is an essential component of the country’s energy generation framework. With a capacity of 300 MW, this facility utilizes coal as its primary fuel source, employing conventional combustion technology to produce electricity efficiently. Ugljevik CHP not only generates power but also provides thermal energy, making it a combined heat and power plant, which is particularly valuable in meeting local heating demands. The role of Ugljevik in the national energy mix is significant, as it contributes to the stability and reliability of the electricity supply in Bosnia and Herzegovina, particularly during high-demand periods. The plant operates within a broader context of energy policy that emphasizes the need for a balanced approach to energy generation, where coal remains a key player despite the global shift towards renewable sources. Ugljevik’s operational efficiency and capacity make it a vital asset for the local grid, ensuring that energy needs are met while supporting the economy. As Bosnia and Herzegovina navigates its energy future, Ugljevik CHP continues to be a cornerstone of its energy infrastructure.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.