Brazil

Usina Hidrelétrica Engenheiro Souza Dias — 1,551 MW Hydroelectric

Hydroelectric Renewable Verified

Usina Hidrelétrica Engenheiro Souza Dias is a 1,551 MW hydro power plant located in Brazil. View location, capacity, and technical details.

Capacity
1,551 MW

Installed

Commissioned
1969

Year online

Owner
China Three Gorges Brasil Energia Ltda.

Operator

Location
-20.78, -51.63

Coordinates

Insights

#25
largest in %s
#150
largest %s worldwide
#1,202
largest worldwide
1969
%d yrs older than avg
1
operated by %s
31
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
1,551 MW
Commissioned
1969
Status
Operational
Owner
China Three Gorges Brasil Energia Ltda.
Country
Brazil
Coordinates
-20.778, -51.629
Wikipedia
Link

Estimated Carbon Footprint

Annual CO₂
130,450 t

tonnes / year

Lifetime CO₂
10.4M t

over ~%d yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

28,359
cars / year
17,393
homes / year
5.9M
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

The Usina Hidrelétrica Engenheiro Souza Dias, also known as the Jupiá Hydroelectric Power Plant, is a significant hydroelectric facility located on the Paraná River in Brazil. Commissioned in 1969, the plant has a total installed capacity of 1551.2 megawatts (MW), making it one of the key contributors to Brazil’s renewable energy landscape. Owned by China Three Gorges Brasil Energia Ltda., it plays an essential role in the country’s energy sector, which relies heavily on hydroelectric power to meet its growing electricity demand.

As a hydroelectric power plant, Usina Hidrelétrica Engenheiro Souza Dias utilizes the kinetic energy of flowing water to generate electricity. Water is channeled through turbines, which then convert the energy of moving water into mechanical energy, and subsequently into electrical energy. This process is inherently more sustainable than fossil fuel-based power generation, as it produces no direct emissions of greenhouse gases during operation. The plant’s reliance on hydroelectricity is instrumental in Brazil’s commitment to renewable energy sources, with hydropower accounting for a substantial portion of the country’s total electricity generation.

Despite its advantages, the operation of hydroelectric plants like Usina Hidrelétrica Engenheiro Souza Dias is not without environmental impact. The construction of the facility necessitated the flooding of large areas of land, which can disrupt local ecosystems and displace communities. Additionally, alterations to the natural flow of the Paraná River can affect fish migration patterns and the health of aquatic ecosystems. However, modern regulatory frameworks and environmental assessments aim to mitigate these impacts, promoting sustainable practices and habitat conservation around such facilities.

Regionally, the Usina Hidrelétrica Engenheiro Souza Dias serves as a critical component of the electrical grid in Brazil, particularly in the southeastern and central-western regions of the country. By providing a stable and significant source of electricity, the plant supports industrial activities and residential power needs, contributing to economic growth and development. Its strategic location along the Paraná River also positions it as a vital link in a network of hydroelectric facilities that enhance energy security and reliability across Brazil.

In conclusion, the Usina Hidrelétrica Engenheiro Souza Dias stands as a testament to Brazil’s investment in renewable energy and its reliance on hydropower. With a capacity of 1551.2 MW, it not only addresses the nation’s energy demands but also reflects the complexities of balancing energy production with environmental stewardship. As Brazil continues to evolve its energy policies, the role of hydroelectric plants like Jupiá will remain central to the country’s vision for a sustainable energy future.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.