Warsak Dam is a 243 MW hydro power plant located in Pakistan. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 243 MW
- Commissioned
- 1960
- Status
- Operational
- Owner
- Water & Power Development Authority
- Country
- Pakistan
- Coordinates
- 34.164, 71.358
- Wikipedia
- Link
Carbon Footprint
tonnes / year
over ~80 yrs
Est. gCO2/kWh
Annual emissions equivalent to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Plants
Tarbela Dam
Pakistan · Hydroelectric
Kalabagh Dam
Pakistan · Hydroelectric
Tarbela
Pakistan · Hydroelectric
Ghazi-Barotha Hydropower Project
Pakistan · Hydroelectric
Ghazi Barotha
Pakistan · Hydroelectric
Mohmand Dam
Pakistan · Hydroelectric
About this plant
The Warsak Dam stands as a vital component of Pakistan’s energy landscape, ranking as the 63rd largest power generation facility among the country’s 198 plants. With a hydroelectric capacity of 242.96 MW, it holds a significant position, contributing 0.25% to Pakistan’s total installed capacity of 98,402 MW. As the 21st largest hydro facility in Pakistan, Warsak Dam showcases the country’s commitment to harnessing its abundant water resources for energy generation.
Commissioned in 1960 and operated by the Water & Power Development Authority, the Warsak Dam utilizes traditional hydroelectric technology to convert the kinetic energy of flowing water into electricity. This facility not only plays a crucial role in meeting the energy demands of the region but also exemplifies the potential of hydroelectric power in a country where water resources are plentiful.
Located in close proximity to several other hydro power generation facilities, the Warsak Dam is part of a robust energy cluster that includes the Mohmand Dam, which boasts a capacity of 800 MW, and both the Warsak Hydropower Station and the original Warsak power facility, each generating 243 MW. Additionally, the Bara Dam, with a capacity of 5.8 MW, rounds out this local energy ecosystem. The combined output of these facilities highlights the significance of hydroelectric power in the region’s power generation mix, particularly as Pakistan seeks to reduce its reliance on fossil fuels.
In the broader context of Pakistan’s energy profile, hydroelectric power is the dominant fuel type, reflecting the country’s strategic focus on renewable energy sources. The Warsak Dam, with its relatively modest share of national capacity, underscores the ongoing challenges and opportunities in scaling up renewable energy production to meet the growing demand.
As it continues to operate, the Warsak Dam not only supports local energy needs but also contributes to the overall stability of Pakistan’s electric grid. The facility’s long-standing presence since its commissioning has fostered local employment and economic activity, making it a cornerstone of the community it serves. Looking ahead, the Warsak Dam could play an even more pivotal role as Pakistan intensifies its efforts to transition towards more sustainable energy practices, ensuring that hydroelectric power remains a cornerstone of its energy future.
More Hydroelectric plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.