Saudi Arabia

YANBU (SWCC) — 520 MW Oil

Oil Verified

YANBU (SWCC) is a 520 MW oil power plant located in Saudi Arabia. View location, capacity, and technical details.

Capacity
520 MW

Installed

Commissioned
1998

Year online

Owner
Saline Water Conversion Corporation (SWCC)

Operator

Location
23.86, 38.38

Coordinates

Insights

#70
largest in Saudi Arabia
#162
largest Oil worldwide
#4,512
largest worldwide
1998
1 yrs newer than avg
6
operated by Saline Water Conversion…
7
plants within 100 km

Technical Details

Fuel Type
Oil
Capacity
520 MW
Commissioned
1998
Status
Operational
Owner
Saline Water Conversion Corporation (SWCC)
Country
Saudi Arabia
Coordinates
23.860, 38.383

Estimated Carbon Footprint

Annual CO₂
1,183,896 t

tonnes / year

Lifetime CO₂
35,516,894 t

over ~30 yrs

Intensity
650 g

gCO₂ per kWh

Annual emissions equal to

257,369
cars / year
157,853
homes / year
53,813,476
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

The YANBU Power Plant, operated by the Saline Water Conversion Corporation (SWCC), is a significant energy facility located in Saudi Arabia. Commissioned in 1998, this power plant has a total capacity of 519.8 megawatts (MW) and primarily utilizes oil as its fuel source. The plant plays a crucial role in the country’s energy sector, particularly in meeting the growing demand for electricity and supporting the extensive desalination processes undertaken by SWCC to provide potable water in arid regions.

As an oil-fired power plant, YANBU converts the chemical energy stored in oil into electrical energy through combustion. The process involves burning oil to heat water in boilers, producing steam that drives turbines connected to generators. This method of energy generation is common in regions rich in oil resources, such as Saudi Arabia. While oil remains a widely used energy source, it poses certain challenges regarding sustainability and environmental impact.

The environmental implications of the YANBU Power Plant, like many fossil fuel-based facilities, include greenhouse gas emissions and air pollutants. The combustion of oil releases carbon dioxide (CO2), sulfur dioxide (SO2), and nitrogen oxides (NOx), contributing to air quality issues and climate change. As Saudi Arabia continues to diversify its energy portfolio and invest in renewable energy sources, the YANBU Power Plant’s reliance on oil highlights the transitional phase of the country’s energy strategy.

Regionally, YANBU holds significant importance not only as a power generation site but also as a part of the broader infrastructure supporting the Kingdom’s economic development. The plant serves the energy needs of the city of Yanbu and surrounding areas, facilitating industrial growth and improving living standards. Its output is vital for powering residential areas, schools, hospitals, and businesses, thereby contributing to the overall socio-economic development of the region.

Furthermore, the YANBU Power Plant is intricately linked to the SWCC’s mission of providing desalinated water. The energy produced at this facility supports the operation of desalination plants, which are crucial for supplying fresh water to a country that experiences low rainfall and high temperatures. This interdependence underscores the plant’s role as a linchpin in the nation’s efforts to ensure water security and energy reliability.

In conclusion, the YANBU Power Plant stands as a pivotal component of Saudi Arabia’s energy landscape. While it showcases the benefits of oil as a reliable fuel source for electricity generation, it also reflects the challenges posed by environmental concerns. As the Kingdom navigates its energy transition, the role of YANBU may evolve, but its contribution to both power generation and water desalination remains essential for the region’s continued growth and development.

More Oil plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.