Türkiye

Yatağan Termik Santrali — 630 MW Coal

Coal Verified

Yatağan Termik Santrali is a 630 MW coal power plant located in Turkey. View location, capacity, and technical details.

Capacity
630 MW

Installed

Commissioned
2002

Year online

Owner
Yatağan Termİk Enerjİ Üretİm Anonİm Şİrketİ

Operator

Location
37.33, 28.10

Coordinates

Insights

#43
largest in %s
#1,310
largest %s worldwide
#3,848
largest worldwide
2002
%d yrs newer than avg
1
operated by %s
26
plants within 100 km

Technical Details

Fuel Type
Coal
Capacity
630 MW
Commissioned
2002
Status
Operational
Owner
Yatağan Termİk Enerjİ Üretİm Anonİm Şİrketİ
Country
Türkiye
Coordinates
37.328, 28.100

Estimated Carbon Footprint

Annual CO₂
2.5M t

tonnes / year

Lifetime CO₂
99.6M t

over ~%d yrs

Intensity
820 g

gCO₂ per kWh

Annual emissions equal to

541,082
cars / year
331,864
homes / year
113.1M
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

Yatağan Termik Santrali, located in the Muğla Province of Turkey, is a significant coal-fired power plant with a total capacity of 630 megawatts (MW). Commissioned in 2002, the facility is owned by Yatağan Termik Enerji Üretim Anonim Şirketi and plays a crucial role in Turkey’s energy sector by contributing to the country’s electricity generation and supporting energy security. The plant primarily utilizes coal as its fuel source, which has been a traditional energy source in Turkey, given the country’s substantial coal reserves. The plant’s operational capacity allows it to meet a considerable portion of the regional demand for electricity, thus playing an integral part in the national grid.

The technical aspects of Yatağan Termik Santrali highlight its reliance on coal, which is characterized by its high energy content and the ability to provide baseload power. The plant utilizes advanced technology to optimize efficiency and reduce emissions. However, the coal combustion process inherently poses challenges, particularly in terms of environmental impact. The burning of coal releases greenhouse gases such as carbon dioxide, contributing to climate change, as well as other pollutants that can affect air quality. The facility is subject to environmental regulations intended to minimize these impacts, including the implementation of filtration systems to capture particulate matter and reduce sulfur dioxide emissions.

In the broader context of Turkey’s energy landscape, Yatağan Termik Santrali is part of a larger strategy to diversify energy sources while still relying heavily on fossil fuels. Turkey has been investing in renewable energy, but coal remains a significant part of the energy mix. The reliance on coal-fired power plants like Yatağan reflects the transitional phase of Turkey’s energy policy, balancing energy independence and environmental considerations.

Regionally, the plant holds economic importance, providing jobs and contributing to the local economy. It also plays a strategic role in ensuring energy availability for industries and residents in the surrounding areas. The facility’s operation not only supports local energy needs but also enhances the national grid’s stability, particularly during peak demand periods. As Turkey continues to navigate its energy challenges, the Yatağan Termik Santrali stands as a testament to the complexities of energy production, balancing the urgent need for electricity with the pressing concerns of environmental sustainability. Overall, the power plant remains a pivotal component in Turkey’s ongoing efforts to secure a reliable energy future while addressing the environmental implications of coal-based energy generation.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.