China

Yunnan Baoshan Tenglongqiao Stage 2 Plant — 81 MW Hydroelectric

Hydroelectric Renewable Verified

Yunnan Baoshan Tenglongqiao Stage 2 Plant is a 81 MW hydro power plant located in China. View location, capacity, and technical details.

Capacity
81 MW

Installed

Commissioned
2015

Year online

Owner
China Three Gorges Corporation

Operator

Location
24.78, 98.69

Coordinates

Insights

#1,621
largest in %s
#2,557
largest %s worldwide
#11,076
largest worldwide
2015
%d yrs newer than avg
508
operated by %s
31
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
81 MW
Commissioned
2015
Status
Operational
Owner
China Three Gorges Corporation
Country
China
Coordinates
24.775, 98.686

Estimated Carbon Footprint

Annual CO₂
6,812 t

tonnes / year

Lifetime CO₂
544,942 t

over ~%d yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

1,481
cars / year
908
homes / year
309,626
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

Yunnan Baoshan Tenglongqiao Stage 2 Plant is an 81 MW hydro power plant in China.

Ranked #346 of 1,000 hydro plants in China, it accounts for 0.03% of the country’s total hydro capacity of 313,039 MW. The largest hydro plant in China is the Three Gorges Dam at 22,500 MW, making this facility 277.8 times smaller.

Nearby plants include Yunnan Baoshan Dengke (120 MW, Hydro), Baoshan Supahe Chaoyang (40 MW, Hydro), and Yunnan Tengchong Longchuan River Stage 1 Plant (24 MW, Hydro). The plant is located in Yunnan Province, approximately 200 km from Kunming.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.