{"id":1420,"date":"2026-08-04T08:46:59","date_gmt":"2026-08-04T08:46:59","guid":{"rendered":""},"modified":"2026-08-04T09:12:51","modified_gmt":"2026-08-04T09:12:51","slug":"besos-grupo-5","status":"publish","type":"wpp_plant","link":"https:\/\/test.worldpowerplants.com\/en-us\/plant\/besos-grupo-5\/","title":{"rendered":"BESOS  GRUPO 5"},"content":{"rendered":"<p>The BESOS GRUPO 5 power plant, located in Spain, represents a significant component of the country&#8217;s energy infrastructure. With a generation capacity of 1,670.81 megawatts (MW), it is one of the largest natural gas-fired power plants in Spain. Commissioned in 2010, the facility is owned and operated by ENDESA GENERACION S.A., a subsidiary of the larger Endesa Group, which is one of the preeminent electric utility companies in the Iberian Peninsula.<\/p>\n<p>Natural gas, the primary fuel source for BESOS GRUPO 5, is known for its efficiency and lower carbon emissions compared to other fossil fuels such as coal and oil. The plant utilizes combined cycle technology, which allows it to generate electricity by employing both gas and steam turbines. In this process, natural gas is burned in a combustion turbine, generating electricity. The waste heat from this process is then captured and used to produce steam, driving a steam turbine that generates additional electricity. This dual-cycle approach not only maximizes energy output but also enhances fuel efficiency, making it a critical asset in Spain&#8217;s move towards cleaner energy production.<\/p>\n<p>In terms of environmental impact, natural gas is often viewed as a transitional fuel in the shift toward more sustainable energy sources. While it does produce carbon dioxide emissions, the levels are significantly lower than those produced by coal-fired plants. Moreover, when compared to the total energy generation portfolio, the BESOS GRUPO 5 facility contributes to reducing overall greenhouse gas emissions in Spain&#8217;s energy sector. Nevertheless, the plant&#8217;s operation must be managed to mitigate other potential environmental concerns, such as methane leakage during the extraction and transportation of natural gas.<\/p>\n<p>BESOS GRUPO 5 plays a pivotal role in Spain&#8217;s energy sector, particularly in providing a reliable and stable supply of electricity. This is especially important given the country&#8217;s growing reliance on renewable energy sources such as wind and solar power, which can be intermittent. The flexible nature of gas-fired power plants allows them to quickly ramp up energy production to meet demand fluctuations, thus supporting grid stability and reliability. As Spain continues to transition toward a more diversified and sustainable energy portfolio, the role of BESOS GRUPO 5 remains vital.<\/p>\n<p>Regionally, the plant contributes to the economic development of the surrounding area by creating jobs and supporting local industries. The facility also plays a role in meeting the energy needs of urban centers, enhancing energy security for millions of residents. As Spain aims for greater energy independence and a reduction in carbon emissions, BESOS GRUPO 5 stands out as an essential infrastructure asset in the ongoing evolution of the country&#8217;s energy landscape.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The BESOS GRUPO 5 power plant, located in Spain, represents a significant component of the country&#8217;s energy infrastructure. With a generation capacity of 1,670.81 megawatts (MW), it is one of the largest natural gas-fired power plants in Spain. Commissioned in 2010, the facility is owned and operated by ENDESA GENERACION S.A., a subsidiary of the [&hellip;]<\/p>\n","protected":false},"featured_media":0,"template":"","meta":{"wpp_capacity_mw":1670.81,"wpp_operator":"ENDESA GENERACION S.A.","wpp_fuel_primary":"Gas","wpp_commissioned_year":2010,"wpp_country_name":"Spain","wpp_country_code":"ESP","wpp_status_val":"Operational","wpp_lat":41.4196,"wpp_lng":2.2294,"wpp_source_id":"20208","wpp_last_verified":"","wpp_verification_source":"","wpp_data_quality":9,"wpp_wikipedia":"","footnotes":""},"wpp_fuel":[12],"wpp_location":[23,189],"wpp_status":[],"class_list":["post-1420","wpp_plant","type-wpp_plant","status-publish","hentry","wpp_fuel-gas","wpp_location-europe","wpp_location-spain"],"_links":{"self":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/1420","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant"}],"about":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/types\/wpp_plant"}],"version-history":[{"count":0,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/1420\/revisions"}],"wp:attachment":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/media?parent=1420"}],"wp:term":[{"taxonomy":"wpp_fuel","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_fuel?post=1420"},{"taxonomy":"wpp_location","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_location?post=1420"},{"taxonomy":"wpp_status","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_status?post=1420"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}