{"id":1511,"date":"2026-08-04T08:48:17","date_gmt":"2026-08-04T08:48:17","guid":{"rendered":""},"modified":"2026-08-04T09:13:13","modified_gmt":"2026-08-04T09:13:13","slug":"jupia-eng-souza-dias","status":"publish","type":"wpp_plant","link":"https:\/\/test.worldpowerplants.com\/en-us\/plant\/jupia-eng-souza-dias\/","title":{"rendered":"Jupi\u00e1 (Eng\u00b0 Souza Dias)"},"content":{"rendered":"<p>The Jupi\u00e1 Hydroelectric Power Plant, also known as Eng\u00ba Souza Dias, is a significant renewable energy facility located on the Paran\u00e1 River in Brazil. Commissioned in 1969, this power plant boasts a total installed capacity of 1551.2 megawatts (MW), making it one of the largest hydroelectric plants in the country. The Jupi\u00e1 plant plays a vital role in Brazil&#8217;s energy sector, contributing to the stability and reliability of the national grid, particularly in meeting the electricity demands of the southeastern and central-western regions of the country.<\/p>\n<p>As a hydroelectric power plant, Jupi\u00e1 utilizes the kinetic energy of flowing water to generate electricity. Water from the Paran\u00e1 River is channeled through turbines, which convert the energy of moving water into mechanical energy, subsequently transformed into electrical energy. The renewable nature of hydroelectric power represents a significant advantage, as it relies on the natural water cycle, thus providing a sustainable energy source with minimal greenhouse gas emissions compared to fossil fuels. The technology employed at Jupi\u00e1 allows for efficient energy production, with a high capacity factor, meaning it can operate at or near its maximum output for extended periods.<\/p>\n<p>However, the environmental impact of hydroelectric plants like Jupi\u00e1 cannot be overlooked. The construction of the plant led to significant alterations in the local ecosystem, including changes in water flow patterns, impacts on aquatic life, and the displacement of communities. The reservoir created by the dam has altered habitats for various species and has raised concerns about the long-term ecological consequences. Nonetheless, the Jupi\u00e1 facility has implemented measures to mitigate some of these impacts, including fish ladders and environmental monitoring programs to help sustain local biodiversity.<\/p>\n<p>Regionally, the Jupi\u00e1 plant is of great significance as it not only contributes to the local economy through job creation but also supports the energy needs of millions of Brazilians. The plant serves as a crucial component of the interconnected Brazilian power grid, which relies heavily on hydropower due to the country\u2019s abundant water resources. With Brazil&#8217;s commitment to increasing the share of renewable energy in its energy mix, Jupi\u00e1 stands as a testament to the country&#8217;s efforts in harnessing hydroelectric power to promote energy independence and reduce reliance on fossil fuels.<\/p>\n<p>In conclusion, the Jupi\u00e1 Hydroelectric Power Plant is a key player in Brazil&#8217;s energy sector, exemplifying both the advantages and challenges associated with large-scale hydroelectric power generation. Its substantial capacity and role in the national grid underscore the importance of renewable energy sources in addressing the country&#8217;s growing energy demands while navigating the complexities of environmental stewardship.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Jupi\u00e1 Hydroelectric Power Plant, also known as Eng\u00ba Souza Dias, is a significant renewable energy facility located on the Paran\u00e1 River in Brazil. Commissioned in 1969, this power plant boasts a total installed capacity of 1551.2 megawatts (MW), making it one of the largest hydroelectric plants in the country. The Jupi\u00e1 plant plays a [&hellip;]<\/p>\n","protected":false},"featured_media":0,"template":"","meta":{"wpp_source_id":"2282","wpp_capacity_mw":1551.2,"wpp_fuel_primary":"Hydro","wpp_commissioned_year":1969,"wpp_operator":"Eletrobras","wpp_country_code":"BRA","wpp_lat":-20.7758,"wpp_lng":-51.6267,"wpp_status_val":"Operational","wpp_last_verified":"","wpp_verification_source":"","wpp_data_quality":9,"wpp_wikipedia":"","footnotes":""},"wpp_fuel":[6],"wpp_location":[140,25],"wpp_status":[],"class_list":["post-1511","wpp_plant","type-wpp_plant","status-publish","hentry","wpp_fuel-hydro","wpp_location-brazil-south-america-3","wpp_location-south-america"],"_links":{"self":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/1511","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant"}],"about":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/types\/wpp_plant"}],"version-history":[{"count":0,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/1511\/revisions"}],"wp:attachment":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/media?parent=1511"}],"wp:term":[{"taxonomy":"wpp_fuel","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_fuel?post=1511"},{"taxonomy":"wpp_location","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_location?post=1511"},{"taxonomy":"wpp_status","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_status?post=1511"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}