{"id":16757,"date":"2026-08-04T11:41:48","date_gmt":"2026-08-04T11:41:48","guid":{"rendered":"https:\/\/test.worldpowerplants.com\/plant\/dois-riachos\/"},"modified":"2026-08-04T11:41:48","modified_gmt":"2026-08-04T11:41:48","slug":"dois-riachos","status":"publish","type":"wpp_plant","link":"https:\/\/test.worldpowerplants.com\/en-us\/plant\/dois-riachos\/","title":{"rendered":"Dois Riachos"},"content":{"rendered":"<p>Dois Riachos is a 30 MW wind power plant in Brazil, commissioned in 2015. It is part of the expanding wind energy sector in the country, operated by an undisclosed entity.<\/p>\n<p>Ranked #49 of 410 wind plants in Brazil, Dois Riachos represents 0.27% of Brazil&#8217;s total wind capacity of 11,309 MW. The largest wind plant in Brazil is Campos Neutrais Wind Farm at 583 MW, making Dois Riachos 19.4 times smaller.<\/p>\n<p>Nearby plants include Damascena (30 MW, Wind). The facility is located in the state of Alagoas, approximately 150 km from Macei\u00f3.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dois Riachos is a 30 MW wind power plant in Brazil, commissioned in 2015. It is part of the expanding wind energy sector in the country, operated by an undisclosed entity. Ranked #49 of 410 wind plants in Brazil, Dois Riachos represents 0.27% of Brazil&#8217;s total wind capacity of 11,309 MW. The largest wind plant [&hellip;]<\/p>\n","protected":false},"featured_media":0,"template":"","meta":{"wpp_capacity_mw":30,"wpp_operator":"Engie Brasil Energia","wpp_fuel_primary":"Wind","wpp_commissioned_year":2015,"wpp_country_name":"Brazil","wpp_country_code":"BRA","wpp_status_val":"Operational","wpp_lat":-11.8225,"wpp_lng":-41.4591,"wpp_source_id":"1862","wpp_last_verified":"","wpp_verification_source":"","wpp_data_quality":10,"wpp_wikipedia":"","footnotes":""},"wpp_fuel":[],"wpp_location":[],"wpp_status":[],"class_list":["post-16757","wpp_plant","type-wpp_plant","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/16757","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant"}],"about":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/types\/wpp_plant"}],"version-history":[{"count":0,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/16757\/revisions"}],"wp:attachment":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/media?parent=16757"}],"wp:term":[{"taxonomy":"wpp_fuel","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_fuel?post=16757"},{"taxonomy":"wpp_location","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_location?post=16757"},{"taxonomy":"wpp_status","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_status?post=16757"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}