{"id":3252,"date":"2026-08-04T09:30:18","date_gmt":"2026-08-04T09:30:18","guid":{"rendered":"https:\/\/test.worldpowerplants.com\/plant\/ctcc-plana-del-vent-2\/"},"modified":"2026-08-04T09:30:18","modified_gmt":"2026-08-04T09:30:18","slug":"ctcc-plana-del-vent-2","status":"publish","type":"wpp_plant","link":"https:\/\/test.worldpowerplants.com\/en-us\/plant\/ctcc-plana-del-vent-2\/","title":{"rendered":"CTCC PLANA DEL VENT 2"},"content":{"rendered":"<p>CTCC PLANA DEL VENT 2 is a gas-fired power plant located in Spain, with a substantial generation capacity of 819.03 megawatts (MW). Commissioned in 2007, the plant is owned and operated by Alpiq Energia Espa\u00f1a S.A.U., a prominent player in the energy sector. This facility represents a significant investment in Spain&#8217;s energy landscape, particularly in the context of the country&#8217;s ongoing transition towards cleaner energy sources and the reduction of greenhouse gas emissions.<\/p>\n<p>As a gas-fired power plant, CTCC PLANA DEL VENT 2 primarily utilizes natural gas as its fuel source. Natural gas is considered one of the cleaner fossil fuels, producing lower carbon dioxide emissions compared to coal and oil when combusted for electricity generation. The operational efficiency of natural gas plants allows for rapid response to fluctuations in electricity demand, making CTCC PLANA DEL VENT 2 an essential component of Spain&#8217;s energy mix. The plant contributes to grid stability, particularly during peak demand periods, and supports the integration of renewable energy sources by providing backup generation when solar and wind resources are insufficient.<\/p>\n<p>The environmental impact of CTCC PLANA DEL VENT 2 is relatively favorable when compared to traditional coal-fired power plants. While the combustion of natural gas does result in carbon emissions, these are significantly lower than those from coal. Additionally, modern gas-fired plants are designed to minimize other pollutants such as sulfur dioxide (SO2) and nitrogen oxides (NOx), thus contributing to improved air quality. However, it is important to recognize that natural gas extraction and transportation can pose environmental challenges, including methane emissions, which are a potent greenhouse gas. Therefore, the plant&#8217;s operation is continuously assessed to balance its energy production capabilities with its environmental responsibilities.<\/p>\n<p>Regionally, CTCC PLANA DEL VENT 2 plays a crucial role in supporting both local and national energy needs. It enhances the energy security of Spain, ensuring that the electricity supply remains reliable and resilient amidst changing demands and the increasing penetration of intermittent renewable energy sources. The presence of such a powerful facility in the Spanish energy grid also serves to attract investment in surrounding areas, fostering economic development and job creation.<\/p>\n<p>In summary, CTCC PLANA DEL VENT 2 stands as a significant asset within Spain&#8217;s energy sector, contributing to the country&#8217;s electricity generation while addressing the challenges of transitioning to a low-carbon future. Its reliance on natural gas as a fuel source positions it as a bridge technology that aids in the gradual shift towards more sustainable energy systems.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>CTCC PLANA DEL VENT 2 is a gas-fired power plant located in Spain, with a substantial generation capacity of 819.03 megawatts (MW). Commissioned in 2007, the plant is owned and operated by Alpiq Energia Espa\u00f1a S.A.U., a prominent player in the energy sector. This facility represents a significant investment in Spain&#8217;s energy landscape, particularly in [&hellip;]<\/p>\n","protected":false},"featured_media":0,"template":"","meta":{"wpp_capacity_mw":819.03,"wpp_operator":"ALPIQ ENERGIA ESPANA S.A.U.","wpp_fuel_primary":"Gas","wpp_commissioned_year":2007,"wpp_country_name":"Spain","wpp_country_code":"ESP","wpp_status_val":"Operational","wpp_lat":40.9596,"wpp_lng":0.8692,"wpp_source_id":"20280","wpp_last_verified":"","wpp_verification_source":"","wpp_data_quality":9,"wpp_wikipedia":"","footnotes":""},"wpp_fuel":[],"wpp_location":[],"wpp_status":[],"class_list":["post-3252","wpp_plant","type-wpp_plant","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/3252","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant"}],"about":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/types\/wpp_plant"}],"version-history":[{"count":0,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/3252\/revisions"}],"wp:attachment":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/media?parent=3252"}],"wp:term":[{"taxonomy":"wpp_fuel","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_fuel?post=3252"},{"taxonomy":"wpp_location","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_location?post=3252"},{"taxonomy":"wpp_status","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_status?post=3252"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}