{"id":3377,"date":"2026-08-04T10:23:52","date_gmt":"2026-08-04T10:23:52","guid":{"rendered":"https:\/\/test.worldpowerplants.com\/plant\/hail2\/"},"modified":"2026-08-04T10:23:52","modified_gmt":"2026-08-04T10:23:52","slug":"hail2","status":"publish","type":"wpp_plant","link":"https:\/\/test.worldpowerplants.com\/en-us\/plant\/hail2\/","title":{"rendered":"HAIL2"},"content":{"rendered":"<p>The HAIL2 power plant, located in Saudi Arabia, is a significant energy generation facility with a capacity of 794.25 megawatts (MW). Commissioned in 2012, it is owned and operated by the Saudi Electricity Company (SEC), which is the primary electricity provider in the Kingdom. HAIL2 plays a crucial role in meeting the growing energy demands of Saudi Arabia, especially in the northern regions, where industrial and residential consumption continues to rise. As an oil-fueled power plant, HAIL2 utilizes crude oil as its primary fuel source, a common practice in a country rich in petroleum resources. The use of oil for electricity generation allows for relatively stable energy production, as the Kingdom has abundant reserves and established infrastructure for extraction and transportation.<\/p>\n<p>The technical specifications of HAIL2 reflect its design as a modern power generation facility. The plant employs advanced combustion technology to optimize efficiency and output while minimizing operational costs. Oil-fired power plants like HAIL2 typically use steam turbines or gas turbines that convert thermal energy from burning oil into mechanical energy, which is then transformed into electrical energy. This process is vital for providing reliable electricity, particularly in areas where demand fluctuates significantly. The strategic location of HAIL2 enhances its ability to supply power to nearby cities and industrial zones, thereby supporting regional economic development.<\/p>\n<p>However, the use of oil as a fuel source raises environmental concerns. Burning fossil fuels contributes to greenhouse gas emissions, which are a primary factor in global climate change. In response to these concerns, the Saudi government has been exploring diversification of its energy mix, including investments in renewable energy sources such as solar and wind. While HAIL2 remains a valuable asset in the immediate term, the long-term sustainability of the energy sector in Saudi Arabia may depend on the gradual transition to cleaner energy technologies.<\/p>\n<p>Regionally, HAIL2 serves as a critical infrastructure component for the northern provinces of Saudi Arabia. It not only supports residential electricity consumption but also provides the necessary power for industrial operations, thus facilitating economic growth and job creation in the area. The reliable output from HAIL2 enhances the overall energy security of the region, ensuring that both urban and rural populations have access to consistent electricity.<\/p>\n<p>In summary, HAIL2 power plant stands as a significant player in Saudi Arabia&#8217;s energy landscape, with its substantial capacity and strategic importance to regional development. While its reliance on oil highlights the challenges of environmental sustainability, its role in supporting the country&#8217;s energy needs remains vital, especially as Saudi Arabia navigates the transition towards a more diversified energy portfolio.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The HAIL2 power plant, located in Saudi Arabia, is a significant energy generation facility with a capacity of 794.25 megawatts (MW). Commissioned in 2012, it is owned and operated by the Saudi Electricity Company (SEC), which is the primary electricity provider in the Kingdom. HAIL2 plays a crucial role in meeting the growing energy demands [&hellip;]<\/p>\n","protected":false},"featured_media":0,"template":"","meta":{"wpp_capacity_mw":794.25,"wpp_operator":"Saudi Electricity Company (SEC)","wpp_fuel_primary":"Oil","wpp_commissioned_year":2012,"wpp_country_name":"Saudi Arabia","wpp_country_code":"SAU","wpp_status_val":"Operational","wpp_lat":27.46,"wpp_lng":41.742,"wpp_source_id":"19754","wpp_last_verified":"","wpp_verification_source":"","wpp_data_quality":9,"wpp_wikipedia":"","footnotes":""},"wpp_fuel":[],"wpp_location":[],"wpp_status":[],"class_list":["post-3377","wpp_plant","type-wpp_plant","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/3377","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant"}],"about":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/types\/wpp_plant"}],"version-history":[{"count":0,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/3377\/revisions"}],"wp:attachment":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/media?parent=3377"}],"wp:term":[{"taxonomy":"wpp_fuel","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_fuel?post=3377"},{"taxonomy":"wpp_location","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_location?post=3377"},{"taxonomy":"wpp_status","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_status?post=3377"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}