{"id":3634,"date":"2026-08-04T10:24:26","date_gmt":"2026-08-04T10:24:26","guid":{"rendered":"https:\/\/test.worldpowerplants.com\/plant\/stesen-jana-kuasa-elektrik-teluk-gong-2\/"},"modified":"2026-08-04T10:24:26","modified_gmt":"2026-08-04T10:24:26","slug":"stesen-jana-kuasa-elektrik-teluk-gong-2","status":"publish","type":"wpp_plant","link":"https:\/\/test.worldpowerplants.com\/en-us\/plant\/stesen-jana-kuasa-elektrik-teluk-gong-2\/","title":{"rendered":"Stesen Jana Kuasa Elektrik Teluk Gong 2"},"content":{"rendered":"<p>Stesen Jana Kuasa Elektrik Teluk Gong 2 is a significant gas-fired power plant located in Malaysia, with a total capacity of 720 megawatts (MW). Owned and operated by Edra Power, this facility plays a crucial role in the country&#8217;s energy sector, contributing to the generation of electricity that supports both residential and industrial needs. As Malaysia continues to experience economic growth and urbanization, the demand for reliable and sustainable energy sources has become increasingly critical. This power plant helps to meet that demand, ensuring a stable electricity supply that is essential for national development.<\/p>\n<p>The plant utilizes natural gas as its primary fuel source, which is a cleaner alternative to coal and oil. Natural gas combustion produces lower levels of carbon dioxide (CO2) and other pollutants, making it a more environmentally friendly option for power generation. The technology employed in Stesen Jana Kuasa Elektrik Teluk Gong 2 incorporates advanced gas turbine systems, which are designed for high efficiency and reduced emissions. This aligns with global efforts to transition towards more sustainable energy practices and reduce the carbon footprint associated with electricity generation.<\/p>\n<p>In terms of environmental impact, the use of natural gas contributes to a lower incidence of air pollution compared to fossil fuels like coal. While the extraction and transportation of natural gas still pose environmental challenges, the operational phase of the power plant is relatively cleaner. The facility also adheres to stringent regulatory standards set by the Malaysian government and international bodies, ensuring that it minimizes its ecological footprint while generating electricity.<\/p>\n<p>The regional significance of Stesen Jana Kuasa Elektrik Teluk Gong 2 cannot be overstated. Situated in a strategic location, the power plant is integral to the stability of the local grid and the broader Malaysian electricity market. It provides essential support during peak demand periods, helping to avoid blackouts and maintain grid reliability. Additionally, the plant&#8217;s capacity contributes to the diversification of Malaysia&#8217;s energy mix, which is crucial as the country seeks to balance its energy needs with environmental sustainability goals.<\/p>\n<p>In summary, Stesen Jana Kuasa Elektrik Teluk Gong 2 represents a vital component of Malaysia&#8217;s energy infrastructure. With its 720 MW capacity and reliance on natural gas, the plant not only enhances energy security but also aligns with environmental objectives aimed at reducing greenhouse gas emissions. As Malaysia continues to evolve in its energy policies and practices, this power facility will likely play an important role in the transition towards a more sustainable and resilient energy future.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Stesen Jana Kuasa Elektrik Teluk Gong 2 is a significant gas-fired power plant located in Malaysia, with a total capacity of 720 megawatts (MW). Owned and operated by Edra Power, this facility plays a crucial role in the country&#8217;s energy sector, contributing to the generation of electricity that supports both residential and industrial needs. As [&hellip;]<\/p>\n","protected":false},"featured_media":0,"template":"","meta":{"wpp_source_id":"45551","wpp_capacity_mw":720,"wpp_fuel_primary":"Gas","wpp_commissioned_year":2016,"wpp_operator":"Edra Power","wpp_country_code":"MYS","wpp_lat":2.3467158,"wpp_lng":102.0507613,"wpp_status_val":"Operational","wpp_last_verified":"2026-02-26T16:40:06.591342+00:00","wpp_verification_source":"osm","wpp_data_quality":9,"wpp_wikipedia":"","footnotes":""},"wpp_fuel":[],"wpp_location":[],"wpp_status":[],"class_list":["post-3634","wpp_plant","type-wpp_plant","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/3634","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant"}],"about":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/types\/wpp_plant"}],"version-history":[{"count":0,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/3634\/revisions"}],"wp:attachment":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/media?parent=3634"}],"wp:term":[{"taxonomy":"wpp_fuel","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_fuel?post=3634"},{"taxonomy":"wpp_location","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_location?post=3634"},{"taxonomy":"wpp_status","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_status?post=3634"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}