{"id":39086,"date":"2026-08-04T13:02:35","date_gmt":"2026-08-04T13:02:35","guid":{"rendered":"https:\/\/test.worldpowerplants.com\/plant\/enel-corugea-wind-farm\/"},"modified":"2026-08-04T13:02:35","modified_gmt":"2026-08-04T13:02:35","slug":"enel-corugea-wind-farm","status":"publish","type":"wpp_plant","link":"https:\/\/test.worldpowerplants.com\/en-us\/plant\/enel-corugea-wind-farm\/","title":{"rendered":"Enel Corugea Wind Farm"},"content":{"rendered":"<p>Enel Corugea Wind Farm is a 0 MW wind power plant in Romania, operated by Enel. Commissioned in 2023, it is one of 48 wind plants in the country. <\/p>\n<p>Ranked #11 of 48 wind plants in Romania, it contributes to a total wind capacity of 1,429 MW. The largest wind plant in Romania is F\u00e2nt\u00e2nele-Cogealac Wind Farm at 600 MW, making Enel Corugea 0 times smaller.<\/p>\n<p>Nearby plants within 50 km include Bunji Dam (7100 MW, Hydro), Ashihama nuclear power plant (2700 MW, Nuclear), and Ladyzhyn power plant (1800 MW, Coal). The facility is located in Romania, approximately 200 km from Bucharest.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Enel Corugea Wind Farm is a 0 MW wind power plant in Romania, operated by Enel. Commissioned in 2023, it is one of 48 wind plants in the country. Ranked #11 of 48 wind plants in Romania, it contributes to a total wind capacity of 1,429 MW. The largest wind plant in Romania is F\u00e2nt\u00e2nele-Cogealac [&hellip;]<\/p>\n","protected":false},"featured_media":0,"template":"","meta":{"wpp_capacity_mw":0,"wpp_operator":"Enel Green Power Romania","wpp_fuel_primary":"Wind","wpp_commissioned_year":2020,"wpp_country_name":"Romania","wpp_country_code":"ROU","wpp_status_val":"Operational","wpp_lat":0,"wpp_lng":0,"wpp_source_id":"38626","wpp_last_verified":"2026-02-13T17:44:41.86626+00:00","wpp_verification_source":"wikidata","wpp_data_quality":10,"wpp_wikipedia":"https:\/\/en.wikipedia.org\/wiki\/Enel_Corugea_Wind_Farm","footnotes":""},"wpp_fuel":[],"wpp_location":[],"wpp_status":[],"class_list":["post-39086","wpp_plant","type-wpp_plant","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/39086","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant"}],"about":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/types\/wpp_plant"}],"version-history":[{"count":0,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/39086\/revisions"}],"wp:attachment":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/media?parent=39086"}],"wp:term":[{"taxonomy":"wpp_fuel","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_fuel?post=39086"},{"taxonomy":"wpp_location","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_location?post=39086"},{"taxonomy":"wpp_status","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_status?post=39086"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}