{"id":5208,"date":"2026-08-04T10:28:04","date_gmt":"2026-08-04T10:28:04","guid":{"rendered":"https:\/\/test.worldpowerplants.com\/plant\/damanhour\/"},"modified":"2026-08-04T10:28:04","modified_gmt":"2026-08-04T10:28:04","slug":"damanhour","status":"publish","type":"wpp_plant","link":"https:\/\/test.worldpowerplants.com\/en-us\/plant\/damanhour\/","title":{"rendered":"Damanhour"},"content":{"rendered":"<p>The Damanhour Power Plant, located in Egypt, is a significant facility in the country&#8217;s energy sector, boasting a capacity of 458 megawatts (MW) and primarily utilizing natural gas as its fuel source. This power plant plays a crucial role in addressing Egypt&#8217;s growing energy demands and contributes to the national grid, ensuring a stable supply of electricity for both residential and industrial consumers. As Egypt continues to develop and modernize its infrastructure, the Damanhour Power Plant stands as a pivotal element in supporting economic growth and social development.<\/p>\n<p>Operating on natural gas, the Damanhour Power Plant benefits from this fuel&#8217;s relatively cleaner combustion compared to other fossil fuels such as coal or oil. Natural gas is considered a more environmentally friendly option, producing lower emissions of carbon dioxide (CO2) and other pollutants. The efficiency of gas-fired power plants, including Damanhour, allows for reduced greenhouse gas emissions per unit of electricity generated, which is a significant advantage in the context of global climate change concerns. The plant&#8217;s technology is designed to optimize fuel use and minimize waste, thereby enhancing its overall environmental performance.<\/p>\n<p>The use of natural gas also aligns with Egypt&#8217;s broader energy strategy, which aims to diversify the energy mix and reduce reliance on more polluting fossil fuels. The Damanhour Power Plant&#8217;s operation contributes to the government&#8217;s efforts to increase the share of natural gas in the energy sector, taking advantage of the country&#8217;s substantial natural gas reserves in the Mediterranean Sea. This strategic move not only supports energy security but also positions Egypt as a potential energy hub in the region, facilitating exports and collaborations with neighboring countries.<\/p>\n<p>In terms of regional significance, the Damanhour Power Plant underscores Egypt&#8217;s commitment to enhancing its energy infrastructure while addressing the challenges posed by a rapidly growing population and industrial sector. By providing a reliable and efficient source of electricity, the plant supports various sectors, including manufacturing, agriculture, and services, which are vital for the country&#8217;s economic development.<\/p>\n<p>Moreover, the Damanhour Power Plant is part of a larger network of energy facilities in Egypt, which are essential for meeting the increasing demand for electricity. As the country continues to invest in renewable energy sources, such as solar and wind, the Damanhour Power Plant will play a complementary role, ensuring that the energy supply remains stable and resilient during the transition to a more diversified energy landscape.<\/p>\n<p>In conclusion, the Damanhour Power Plant is not just a power generation facility; it is a critical component of Egypt&#8217;s energy strategy, balancing economic growth with environmental considerations. Its reliance on natural gas highlights the ongoing transformation in Egypt&#8217;s energy sector, aiming for a cleaner and more sustainable future while meeting the demands of its population and industries.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Damanhour Power Plant, located in Egypt, is a significant facility in the country&#8217;s energy sector, boasting a capacity of 458 megawatts (MW) and primarily utilizing natural gas as its fuel source. This power plant plays a crucial role in addressing Egypt&#8217;s growing energy demands and contributes to the national grid, ensuring a stable supply [&hellip;]<\/p>\n","protected":false},"featured_media":0,"template":"","meta":{"wpp_capacity_mw":458,"wpp_operator":"Egyptian Electricity Holding Company","wpp_fuel_primary":"Gas","wpp_commissioned_year":1999,"wpp_country_name":"Egypt","wpp_country_code":"EGY","wpp_status_val":"Operational","wpp_lat":31.0817,"wpp_lng":30.4293,"wpp_source_id":"10004","wpp_last_verified":"","wpp_verification_source":"","wpp_data_quality":9,"wpp_wikipedia":"","footnotes":""},"wpp_fuel":[],"wpp_location":[],"wpp_status":[],"class_list":["post-5208","wpp_plant","type-wpp_plant","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/5208","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant"}],"about":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/types\/wpp_plant"}],"version-history":[{"count":0,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/5208\/revisions"}],"wp:attachment":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/media?parent=5208"}],"wp:term":[{"taxonomy":"wpp_fuel","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_fuel?post=5208"},{"taxonomy":"wpp_location","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_location?post=5208"},{"taxonomy":"wpp_status","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_status?post=5208"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}