{"id":5676,"date":"2026-08-04T10:29:15","date_gmt":"2026-08-04T10:29:15","guid":{"rendered":"https:\/\/test.worldpowerplants.com\/plant\/ctcc-sabon-grupo-3\/"},"modified":"2026-08-04T10:29:15","modified_gmt":"2026-08-04T10:29:15","slug":"ctcc-sabon-grupo-3","status":"publish","type":"wpp_plant","link":"https:\/\/test.worldpowerplants.com\/en-us\/plant\/ctcc-sabon-grupo-3\/","title":{"rendered":"CTCC SABON  GRUPO 3"},"content":{"rendered":"<p>CTCC SABON GRUPO 3 is a modern gas-fired power plant situated in Spain, contributing significantly to the country&#8217;s energy generation capabilities. With a capacity of 391.31 MW, this facility, commissioned in 2008, plays a crucial role in supporting the Spanish energy grid, particularly as the country integrates more renewable energy sources. Located at coordinates 43.3290, -8.5030, CTCC SABON GRUPO 3 employs advanced combined cycle gas turbine technology, which enhances efficiency and minimizes emissions compared to traditional fossil fuel plants. Operated by GAS NATURAL FENOSA GENERACION S.L.U., this facility is a vital component of Spain&#8217;s energy strategy, which aims to balance the increasing share of renewables with stable and reliable electricity supply. The operational context of CTCC SABON GRUPO 3 reflects Spain&#8217;s commitment to achieving its climate targets while ensuring energy security. As the country continues to invest in renewable energy infrastructure, gas power plants like CTCC SABON GRUPO 3 are essential for providing backup generation during periods of low renewable output. This facility\u2019s capacity and technological advancements make it a key player in maintaining grid stability and supporting the transition to a more sustainable energy future.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>CTCC SABON GRUPO 3 is a modern gas-fired power plant situated in Spain, contributing significantly to the country&#8217;s energy generation capabilities. With a capacity of 391.31 MW, this facility, commissioned in 2008, plays a crucial role in supporting the Spanish energy grid, particularly as the country integrates more renewable energy sources. Located at coordinates 43.3290, [&hellip;]<\/p>\n","protected":false},"featured_media":0,"template":"","meta":{"wpp_capacity_mw":391.31,"wpp_operator":"GAS NATURAL FENOSA GENERACION  S.L.U.","wpp_fuel_primary":"Gas","wpp_commissioned_year":2008,"wpp_country_name":"Spain","wpp_country_code":"ESP","wpp_status_val":"Operational","wpp_lat":43.329,"wpp_lng":-8.503,"wpp_source_id":"20281","wpp_last_verified":"","wpp_verification_source":"","wpp_data_quality":9,"wpp_wikipedia":"","footnotes":""},"wpp_fuel":[],"wpp_location":[],"wpp_status":[],"class_list":["post-5676","wpp_plant","type-wpp_plant","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/5676","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant"}],"about":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/types\/wpp_plant"}],"version-history":[{"count":0,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/5676\/revisions"}],"wp:attachment":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/media?parent=5676"}],"wp:term":[{"taxonomy":"wpp_fuel","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_fuel?post=5676"},{"taxonomy":"wpp_location","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_location?post=5676"},{"taxonomy":"wpp_status","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_status?post=5676"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}