{"id":6371,"date":"2026-08-04T10:31:58","date_gmt":"2026-08-04T10:31:58","guid":{"rendered":"https:\/\/test.worldpowerplants.com\/plant\/chixoy\/"},"modified":"2026-08-04T10:31:58","modified_gmt":"2026-08-04T10:31:58","slug":"chixoy","status":"publish","type":"wpp_plant","link":"https:\/\/test.worldpowerplants.com\/en-us\/plant\/chixoy\/","title":{"rendered":"Chixoy"},"content":{"rendered":"<p>The Chixoy hydroelectric power plant stands as a landmark in Guatemala&#8217;s energy generation sector, with a capacity of 300 MW. Commissioned in 1983, this facility harnesses the power of the Chixoy River through a dam system, utilizing the kinetic energy of flowing water to generate electricity. Located at coordinates 15.2800\u00b0 N latitude and 90.4910\u00b0 W longitude, the Chixoy plant is integral to the local and national grid, providing a renewable energy source that significantly reduces reliance on fossil fuels. Positioned in a region rich in water resources, the plant represents Guatemala&#8217;s commitment to sustainable energy solutions, aligning with national policies aimed at increasing the share of renewable energy in the overall energy mix. The Chixoy power plant not only contributes to energy stability but also plays a vital role in supporting the country&#8217;s economic development, particularly in rural areas where access to electricity can transform lives. Its operational efficiency and renewable nature make it a cornerstone of Guatemala&#8217;s energy strategy.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Chixoy hydroelectric power plant stands as a landmark in Guatemala&#8217;s energy generation sector, with a capacity of 300 MW. Commissioned in 1983, this facility harnesses the power of the Chixoy River through a dam system, utilizing the kinetic energy of flowing water to generate electricity. Located at coordinates 15.2800\u00b0 N latitude and 90.4910\u00b0 W [&hellip;]<\/p>\n","protected":false},"featured_media":0,"template":"","meta":{"wpp_capacity_mw":300,"wpp_operator":"Instituto Nacional de Electrificaci\u00f3n","wpp_fuel_primary":"Hydro","wpp_commissioned_year":1983,"wpp_country_name":"Guatemala","wpp_country_code":"GTM","wpp_status_val":"Operational","wpp_lat":15.28,"wpp_lng":-90.491,"wpp_source_id":"13888","wpp_last_verified":"","wpp_verification_source":"","wpp_data_quality":9,"wpp_wikipedia":"","footnotes":""},"wpp_fuel":[],"wpp_location":[],"wpp_status":[],"class_list":["post-6371","wpp_plant","type-wpp_plant","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/6371","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant"}],"about":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/types\/wpp_plant"}],"version-history":[{"count":0,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/6371\/revisions"}],"wp:attachment":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/media?parent=6371"}],"wp:term":[{"taxonomy":"wpp_fuel","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_fuel?post=6371"},{"taxonomy":"wpp_location","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_location?post=6371"},{"taxonomy":"wpp_status","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_status?post=6371"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}