{"id":7919,"date":"2026-08-04T10:36:20","date_gmt":"2026-08-04T10:36:20","guid":{"rendered":"https:\/\/test.worldpowerplants.com\/plant\/shawinigan-3\/"},"modified":"2026-08-04T10:36:20","modified_gmt":"2026-08-04T10:36:20","slug":"shawinigan-3","status":"publish","type":"wpp_plant","link":"https:\/\/test.worldpowerplants.com\/en-us\/plant\/shawinigan-3\/","title":{"rendered":"Shawinigan-3"},"content":{"rendered":"<p>Ranked as the 173rd largest power generation facility in Canada, Shawinigan-3 stands as a significant contributor to the nation\u2019s hydroelectric landscape. With a capacity of 194 MW, this hydro plant is among the 612 hydro facilities in the country, placing it 97th in hydro capacity rankings. Situated in Quebec, Shawinigan-3 is an essential component of Hydro-Qu\u00e9bec&#8217;s extensive network, illustrating the province&#8217;s commitment to renewable energy sources, particularly hydroelectric power, which dominates Canada&#8217;s energy profile. The facility contributes approximately 0.10% to Canada\u2019s total capacity of 193,190 MW, showcasing its pivotal, albeit modest, role in the overall energy mix.<\/p>\n<p>The technology utilized at Shawinigan-3 is typical of hydroelectric plants, harnessing the kinetic energy of flowing water to generate electricity. This method not only provides a renewable source of energy but also boasts a low environmental impact compared to fossil fuel counterparts. The plant&#8217;s design enables it to efficiently convert the gravitational potential energy of water into electrical energy, making it a model of sustainable energy production.<\/p>\n<p>In its regional context, Shawinigan-3 is part of a diverse energy cluster. Notably, within a 50 km radius, other significant facilities include the Gentilly Nuclear Generating Station, boasting a capacity of 675 MW, and the B\u00e9cancour facility, which operates on natural gas with capacities of 507 MW and 411 MW. Additionally, the Rocher-de-Grand-M\u00e8re hydro facility, with a capacity of 230 MW, and Shawinigan-2, at 200 MW, further illustrate the variety of energy sources in the area, emphasizing the importance of hydroelectric power in this energy landscape.<\/p>\n<p>Canada&#8217;s energy profile is heavily dominated by hydroelectric power, which accounts for a significant portion of the national capacity. This reliance on renewable sources is vital for meeting the energy demands of a growing population while striving to reduce carbon emissions. Shawinigan-3 plays a crucial role in this framework, helping to stabilize the grid and provide a reliable power supply.<\/p>\n<p>Operated by Hydro-Qu\u00e9bec, Shawinigan-3 was commissioned years ago, contributing to the province&#8217;s energy infrastructure for decades. Its strategic operation reflects the utility&#8217;s commitment to sustainable energy practices and the continued development of renewable energy resources in Canada.<\/p>\n<p>Looking forward, Shawinigan-3 represents more than just a power generation facility; it symbolizes the broader transition towards renewable energy. As Canada continues to prioritize sustainability and reduce its carbon footprint, plants like Shawinigan-3 will be integral in supporting the country\u2019s energy needs while promoting environmental stewardship.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ranked as the 173rd largest power generation facility in Canada, Shawinigan-3 stands as a significant contributor to the nation\u2019s hydroelectric landscape. With a capacity of 194 MW, this hydro plant is among the 612 hydro facilities in the country, placing it 97th in hydro capacity rankings. Situated in Quebec, Shawinigan-3 is an essential component of [&hellip;]<\/p>\n","protected":false},"featured_media":0,"template":"","meta":{"wpp_capacity_mw":194,"wpp_operator":"Hydro-Qu\u00e9bec","wpp_fuel_primary":"Hydro","wpp_commissioned_year":2000,"wpp_country_name":"Canada","wpp_country_code":"CAN","wpp_status_val":"Operational","wpp_lat":46.5338,"wpp_lng":-72.7656,"wpp_source_id":"4507","wpp_last_verified":"","wpp_verification_source":"","wpp_data_quality":9,"wpp_wikipedia":"","footnotes":""},"wpp_fuel":[],"wpp_location":[],"wpp_status":[],"class_list":["post-7919","wpp_plant","type-wpp_plant","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/7919","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant"}],"about":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/types\/wpp_plant"}],"version-history":[{"count":0,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/7919\/revisions"}],"wp:attachment":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/media?parent=7919"}],"wp:term":[{"taxonomy":"wpp_fuel","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_fuel?post=7919"},{"taxonomy":"wpp_location","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_location?post=7919"},{"taxonomy":"wpp_status","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_status?post=7919"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}