{"id":8232,"date":"2026-08-04T10:37:45","date_gmt":"2026-08-04T10:37:45","guid":{"rendered":"https:\/\/test.worldpowerplants.com\/plant\/sir-adam-beck-pump\/"},"modified":"2026-08-04T10:37:45","modified_gmt":"2026-08-04T10:37:45","slug":"sir-adam-beck-pump","status":"publish","type":"wpp_plant","link":"https:\/\/test.worldpowerplants.com\/en-us\/plant\/sir-adam-beck-pump\/","title":{"rendered":"Sir Adam Beck Pump"},"content":{"rendered":"<p>Sir Adam Beck Pump represents a crucial part of Canada&#8217;s hydroelectric power generation, ranking #192 among 1334 power plants nationwide. With a capacity of 174 MW, it holds the position of the 110th largest hydro facility out of 612 in Canada, symbolizing a small yet vital component of the country&#8217;s extensive hydroelectric network, which accounts for a significant portion of its energy supply. This plant contributes approximately 0.09% to Canada&#8217;s total capacity of 193,190 MW, a reflection of the nation\u2019s overwhelming reliance on hydroelectricity as its dominant fuel source. Situated near Niagara Falls, Sir Adam Beck Pump utilizes the gravitational force of water to drive turbines, a renewable and efficient energy generation technology that harnesses one of Canada\u2019s most abundant natural resources. The plant\u2019s neighbors include the formidable Robert Moses Niagara, which boasts an impressive 2429 MW capacity, and several other hydro facilities like Sir Adam Beck 2 and Thorold CGS, highlighting a robust hydro cluster that significantly influences the regional grid. The collective capabilities of these plants underscore the region\u2019s strength in hydroelectric power, contrasting with the national average capacity of about 144 MW per plant, where Sir Adam Beck Pump stands as a moderate contributor to the overall energy landscape. Owned and operated by Hydro One, the facility has been a reliable power source since its commissioning. As Canada continues to prioritize renewable energy and reduce greenhouse gas emissions, Sir Adam Beck Pump\u2019s role will likely evolve, aligning with national goals for sustainability while ensuring that the energy needs of local communities are met.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sir Adam Beck Pump represents a crucial part of Canada&#8217;s hydroelectric power generation, ranking #192 among 1334 power plants nationwide. With a capacity of 174 MW, it holds the position of the 110th largest hydro facility out of 612 in Canada, symbolizing a small yet vital component of the country&#8217;s extensive hydroelectric network, which accounts [&hellip;]<\/p>\n","protected":false},"featured_media":0,"template":"","meta":{"wpp_source_id":"4524","wpp_capacity_mw":174,"wpp_fuel_primary":"Hydro","wpp_commissioned_year":1920,"wpp_operator":"Ontario Power Generation","wpp_country_code":"CAN","wpp_lat":43.1446,"wpp_lng":-79.0599,"wpp_status_val":"Operational","wpp_last_verified":"","wpp_verification_source":"","wpp_data_quality":9,"wpp_wikipedia":"","footnotes":""},"wpp_fuel":[],"wpp_location":[],"wpp_status":[],"class_list":["post-8232","wpp_plant","type-wpp_plant","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/8232","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant"}],"about":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/types\/wpp_plant"}],"version-history":[{"count":0,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_plant\/8232\/revisions"}],"wp:attachment":[{"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/media?parent=8232"}],"wp:term":[{"taxonomy":"wpp_fuel","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_fuel?post=8232"},{"taxonomy":"wpp_location","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_location?post=8232"},{"taxonomy":"wpp_status","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/en-us\/wp-json\/wp\/v2\/wpp_status?post=8232"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}