Planta de ciclo combinado Tanjung Kidurong es una planta de energía 1,324 MW gas ubicada en Malasia. Ver ubicación, capacidad y detalles técnicos.
Instalada
Año de conexión
Operador
Coordenadas
Análisis
Ubicación
Detalles Técnicos
- Tipo de Combustible
- Gas Natural
- Capacidad
- 1,324 MW
- Comisionado
- 2015
- Status
- Operational
- Propietario
- Sarawak Energy
- País
- Malaysia
- Coordenadas
- 3.291, 113.093
Huella de Carbono
toneladas / año
durante ~30 años
Est. gCO2/kWh
Emisiones anuales equivalentes a
Estimación orientativa basada en factores estándar de emisión del ciclo de vida y de capacidad — no es un valor medido. Abrir calculadora
Plantas Cercanas
Empangan Bakun
Malasia · Hidroeléctrica
Represa Bakun
Malasia · Hidroeléctrica
Bintulu Power Station
Malasia · Gas Natural
Baleh Dam
Malasia · Hidroeléctrica
Baram Dam
Malasia · Hidroeléctrica
Murum Dam
Malasia · Hidroeléctrica
About this plant
The Tanjung Kidurong Combined Cycle Plant is a critical gas-fired power generation facility in Malaysia, boasting a capacity of 1,324 MW. This power plant plays a vital role in the nation’s energy generation strategy, enhancing the reliability and efficiency of the electrical supply in the region. Utilizing combined cycle technology, Tanjung Kidurong maximizes energy output by using waste heat from gas turbines to produce additional electricity, making it one of the more efficient forms of energy generation available. Located at coordinates 3.2908, 113.0929, the plant is strategically positioned to serve the growing energy needs of the local population and industries. Operated by Sarawak Energy, Tanjung Kidurong is integral to the grid, ensuring that it meets the increasing demand for electricity while adhering to Malaysia’s energy policies that emphasize sustainability and reduced emissions. The facility’s substantial MW capacity underscores its importance in the energy mix of Malaysia, providing a stable power supply that supports both economic growth and environmental goals. As the country progresses towards a diversified energy portfolio, the Tanjung Kidurong Combined Cycle Plant exemplifies the role of gas technology in achieving these objectives, highlighting its contribution to a sustainable energy future.
Más centrales de Gas Natural
¿Has detectado un error?
Nuestros datos son verificados por la comunidad. Si algún dato parece incorrecto o desactualizado, sugiere una corrección a continuación: nuestro equipo la revisa y aplica los cambios aprobados en todos los idiomas.