Nueva Central Eléctrica de la Capital Administrativa — 4,800 MW Gas Natural
Nueva Central Eléctrica de la Capital Administrativa es una planta de energía 4,800 MW gas ubicada en Egipto. Ver ubicación, capacidad y detalles técnicos.
Installed
Year online
Operator
Coordenadas
Insights
Ubicación
Detalles Técnicos
- Tipo de Combustible
- Gas Natural
- Capacidad
- 4,800 MW
- Comisionado
- 2017
- Status
- Operational
- Propietario
- Egyptian Electricity Holding Company (EEHC)
- País
- Egypt
- Coordenadas
- 29.909, 31.755
- Wikipedia
- Link
Huella de Carbono
tonnes / year
over ~30 yrs
Est. gCO2/kWh
Emisiones anuales equivalentes a
Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator
Plantas Cercanas
Planta de Energía de Beni Suef
Egipto · Gas Natural
Planta de Energía Nueva Capital
Egipto · Gas Natural
Beni Suef Combined Cycle Power Station
Egipto · Gas Natural
Sector de Al-Karimat
Egipto · Gas Natural
Kuriemat 2
Egipto · Gas Natural
El Kuriemat Power Plant
Egipto · Gas Natural
About this plant
محطة كهرباء العاصمة الإدارية الجديدة is a cutting-edge power generation facility located in Egypt, contributing significantly to the country’s expanding energy landscape. Utilizing natural gas as its primary fuel type, this power plant plays a vital role in supporting Egypt’s commitment to reducing greenhouse gas emissions and enhancing the reliability of its energy supply. With an impressive capacity of 4,800 MW, the plant is among the largest in the region, making it a cornerstone of Egypt’s energy infrastructure.
Geographically positioned at coordinates 29.9087 latitude and 31.7553 longitude, the new administrative capital power plant is strategically located to serve the burgeoning demand for electricity in the newly developed administrative capital of Egypt. Operated by the Egyptian Electricity Holding Company (EEHC), this facility is part of a broader initiative to modernize Egypt’s energy sector and ensure sustainable energy access for its growing population. Commissioned in 2017, the plant reflects the country’s ambitious energy policy aimed at diversifying energy sources and increasing the efficiency of electricity generation.
The technology employed at محطة كهرباء العاصمة الإدارية الجديدة is based on advanced combined cycle gas turbine (CCGT) systems, which are renowned for their efficiency and lower emissions compared to traditional fossil fuel-based power generation technologies. This state-of-the-art technology allows the plant to maximize electricity output while minimizing the environmental footprint, aligning with Egypt’s national strategy to incorporate cleaner energy solutions into its energy mix.
The 4,800 MW capacity of this power plant is significant in stabilizing the electricity grid, particularly in the context of Egypt’s rapid urbanization. As the new administrative capital develops, the demand for reliable and sustainable electricity continues to grow, making this facility crucial to meeting the energy needs of both current and future residents. Additionally, the plant supports Egypt’s aspirations to become a regional energy hub, promoting energy trade and cooperation with neighboring countries.
In summary, محطة كهرباء العاصمة الإدارية الجديدة serves as a vital component of Egypt’s energy generation landscape. With its advanced gas technology, substantial capacity, and strategic location, this power generation facility exemplifies the country’s dedication to modernizing its energy infrastructure and ensuring a sustainable energy future for all.
More Gas Natural plants
¿Has detectado un error?
Our data is community-verified. If any detail on this page looks wrong or out of date, let us know and we will review it.