Poland

Elektrocieplownia Czechnica 2 — 179 MW Gas Natural

Gas Natural Verificado

Elektrocieplownia Czechnica 2 es una planta de energía 179 MW gas ubicada en Polonia. Ver ubicación, capacidad y detalles técnicos.

Capacidad
179 MW

Installed

Comisionado
2025

Year online

Propietario
ZEW Kogeneracja

Operator

Ubicación
51.04, 17.14

Coordenadas

Insights

#81
largest in Polonia
#2,743
largest Gas Natural worldwide
#7,857
largest worldwide
2025
26 yrs newer than avg
2
operated by ZEW Kogeneracja
29
plants within 100 km

Detalles Técnicos

Tipo de Combustible
Gas Natural
Capacidad
179 MW
Comisionado
2025
Status
Operational
Propietario
ZEW Kogeneracja
País
Poland
Coordenadas
51.039, 17.138

Huella de Carbono

CO₂ Anual
345,753 t

tonnes / year

CO₂ de por vida
10,372,585 t

over ~30 yrs

Intensity
490 g

Est. gCO2/kWh

Emisiones anuales equivalentes a

75,164
automóviles al año
46,100
hogares al año
15,716,037
árboles para compensar

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Plantas Cercanas

About this plant

Electrociepłownia Czechnica 2 stands out as Poland’s 81st largest power generation facility among 318 plants, contributing a notable 0.22% to the nation’s electricity landscape. With a capacity of 179 MW, it ranks 14th among the 27 gas plants in the country, highlighting its importance within the regional energy matrix. Commissioned in 2025 by ZEW Kogeneracja, this facility represents a modern approach to power generation, utilizing natural gas to produce electricity and heat, thus aligning with Poland’s ongoing transition from coal dependency.

Technologically, Electrociepłownia Czechnica 2 employs combined heat and power (CHP) systems, enhancing efficiency by simultaneously generating electricity and useful thermal energy. This dual-purpose output is especially vital in urban areas, where demand for heating is significant, particularly during the colder months. The plant’s strategic location near Wrocław allows it to effectively serve the local grid, offering reliable energy while complementing nearby facilities.

Within a 50 km radius, several other power generation facilities operate, including the coal-fired EC Wrocław with a capacity of 263 MW, and the Wrocław combined heat and power plant, which has a capacity of 262.6 MW. These plants, primarily coal-dependent, contrast with Czechnica 2’s cleaner gas technology, underlining the shift toward more sustainable energy sources in the region. Other nearby coal plants, such as Elektrociepłownia Wrocław (260 MW) and EC Czechnica (110 MW), further emphasize the local reliance on coal, which still dominates Poland’s energy profile.

Poland’s energy landscape is characterized by its total capacity of 82,656 MW, with coal as the dominant fuel. The introduction of Electrociepłownia Czechnica 2 marks a critical step in diversifying the fuel mix and reducing greenhouse gas emissions. As the country strives to meet European Union climate targets, facilities like Czechnica 2 will play a pivotal role in transitioning towards a more sustainable future.

The ownership by ZEW Kogeneracja signifies a commitment to modernizing Poland’s energy infrastructure. With its commissioning in 2025, this facility is positioned to significantly impact both local and national energy supply. As Poland continues to navigate its energy transition, Electrociepłownia Czechnica 2 stands as a beacon of progress, showcasing how gas plants can effectively bridge the gap between traditional coal reliance and a cleaner, more sustainable energy future.

More Gas Natural plants

¿Has detectado un error?

Our data is community-verified. If any detail on this page looks wrong or out of date, let us know and we will review it.