{"id":1413,"date":"2026-08-04T13:04:22","date_gmt":"2026-08-04T13:04:22","guid":{"rendered":"https:\/\/test.worldpowerplants.com\/ja\/plant\/lingbei-thermal-power-station\/"},"modified":"2026-08-04T13:04:22","modified_gmt":"2026-08-04T13:04:22","slug":"lingbei-thermal-power-station","status":"publish","type":"wpp_plant","link":"https:\/\/test.worldpowerplants.com\/ja\/plant\/lingbei-thermal-power-station\/","title":{"rendered":"\u5dba\u5317\u706b\u529b\u767a\u96fb\u6240"},"content":{"rendered":"<p>The \u82d3\u5317\u706b\u529b\u767a\u96fb\u6240, or the Ringo Power Station, is a significant coal-fired power generation facility located in Japan. With a robust capacity of 1400 MW, it is operated by \u4e5d\u5dde\u96fb\u529b\u682a\u5f0f\u4f1a\u793e (Kyushu Electric Power Company) and plays an essential role in the national energy landscape. Situated at coordinates 32.4853, 130.0418, this power plant is strategically positioned to serve the electricity needs of the Kyushu region, known for its substantial industrial and residential energy demands. The facility employs advanced coal combustion technology, which is pivotal for efficient energy generation. As Japan continues to recover from the impacts of the Fukushima disaster and reassess its energy policies, the Ringo Power Station stands at the crossroads of traditional energy reliance and the push towards renewable energy sources. The power station&#8217;s capacity allows it to provide significant base-load power, ensuring stability in the local grid, particularly during peak demand periods. In the broader context of Japan&#8217;s energy policy, Ringo Power Station symbolizes the challenges of balancing energy security with environmental considerations as the country moves towards a sustainable energy future while still relying on fossil fuels.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The \u82d3\u5317\u706b\u529b\u767a\u96fb\u6240, or the Ringo Power Station, is a significant coal-fired power generation facility located in Japa [&hellip;]<\/p>\n","protected":false},"featured_media":0,"template":"","meta":{"wpp_source_id":"43281","wpp_capacity_mw":1400,"wpp_fuel_primary":"Coal","wpp_commissioned_year":1995,"wpp_operator":"Kyushu Electric Power","wpp_country_code":"JPN","wpp_lat":32.4852585,"wpp_lng":130.0417939,"wpp_status_val":"Operational","wpp_last_verified":"2026-02-22T11:28:52.879394+00:00","wpp_verification_source":"osm","wpp_data_quality":9,"wpp_wikipedia":"https:\/\/ja.wikipedia.org\/wiki\/\u82d3\u5317\u767a\u96fb\u6240","footnotes":""},"wpp_fuel":[],"wpp_location":[],"wpp_status":[],"class_list":["post-1413","wpp_plant","type-wpp_plant","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/test.worldpowerplants.com\/ja\/wp-json\/wp\/v2\/wpp_plant\/1413","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/test.worldpowerplants.com\/ja\/wp-json\/wp\/v2\/wpp_plant"}],"about":[{"href":"https:\/\/test.worldpowerplants.com\/ja\/wp-json\/wp\/v2\/types\/wpp_plant"}],"version-history":[{"count":0,"href":"https:\/\/test.worldpowerplants.com\/ja\/wp-json\/wp\/v2\/wpp_plant\/1413\/revisions"}],"wp:attachment":[{"href":"https:\/\/test.worldpowerplants.com\/ja\/wp-json\/wp\/v2\/media?parent=1413"}],"wp:term":[{"taxonomy":"wpp_fuel","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/ja\/wp-json\/wp\/v2\/wpp_fuel?post=1413"},{"taxonomy":"wpp_location","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/ja\/wp-json\/wp\/v2\/wpp_location?post=1413"},{"taxonomy":"wpp_status","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/ja\/wp-json\/wp\/v2\/wpp_status?post=1413"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}