Norway

Aurland5 — 1,398 MW Hydroelectric

Hydroelectric Renewable Verified

Aurland5 is a 1,398 MW hydro power plant located in Norway. View location, capacity, and technical details.

Capacity
1,398 MW

Installed

Commissioned
1980

Year online

Owner
Statkraft

Operator

Location
60.86, 7.30

Coordinates

Insights

#2
largest in Norway
#190
largest Hydroelectric worldwide
#1,437
largest worldwide
1980
4 yrs older than avg
264
operated by Statkraft
30
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
1,398 MW
Commissioned
1980
Status
Operational
Owner
Statkraft
Country
Norway
Coordinates
60.863, 7.302

Carbon Footprint

Annual CO₂
117,566 t

tonnes / year

Lifetime CO₂
9,405,297 t

over ~80 yrs

Intensity
24 g

Est. gCO2/kWh

Annual emissions equivalent to

25,558
cars per year
15,675
homes per year
5,343,919
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Plants

About this plant

Aurland5 is a significant hydroelectric power plant located in Norway, boasting a generation capacity of 1398 megawatts (MW). This facility exemplifies Norway’s commitment to harnessing renewable energy sources, particularly hydro power, which is the backbone of the nation’s energy sector. Norway is renowned for its vast water resources and mountainous terrain, making it one of the world’s largest producers of renewable energy, with hydroelectric plants accounting for approximately 95% of its electricity generation.

The Aurland5 plant utilizes hydro power, a clean and renewable energy source that generates electricity by harnessing the kinetic energy of flowing water. In the case of Aurland5, water is collected from the surrounding mountains and channeled through turbines that convert the energy of the flowing water into electrical power. This method of energy production is not only efficient but also significantly reduces greenhouse gas emissions compared to fossil fuels. The hydroelectric process involves minimal pollution, making it an environmentally friendly alternative to traditional energy sources.

In terms of technical details, Aurland5 operates within a larger system of reservoirs and dams that manage water flow and optimize energy production. The plant’s design includes advanced turbine technology that maximizes energy efficiency and minimizes ecological disturbance. Norway’s stringent environmental regulations ensure that hydroelectric plants like Aurland5 are developed with careful consideration of their ecological impact, including fish migration and local ecosystems. The facility is equipped with fish passages and other measures to mitigate the environmental footprint of its operations.

The environmental impact of hydroelectric power plants is generally positive when compared to fossil fuel plants, as they do not emit carbon dioxide during operation. However, the construction of dams and alteration of water flow can affect local wildlife and habitats. Aurland5 has implemented several initiatives to monitor and enhance biodiversity in the region, demonstrating a commitment to sustainable energy practices.

Regionally, Aurland5 plays a vital role in stabilizing Norway’s electricity grid, particularly given the country’s reliance on renewable energy sources. The plant contributes to energy security by providing a reliable and consistent power supply, which is crucial for both residential and industrial consumers. Additionally, Aurland5 supports Norway’s export of renewable energy to neighboring countries, reinforcing the nation’s position as a leader in sustainable energy practices.

In conclusion, Aurland5 represents not only a critical component of Norway’s energy infrastructure but also a commitment to sustainable development through renewable resources. As global energy demands continue to rise, facilities like Aurland5 will play an increasingly vital role in promoting a cleaner, greener future.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail on this page looks wrong or out of date, let us know and we will review it.