Gezende HES is a 159 MW hydro power plant located in Turkey. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 159 MW
- Commissioned
- 2015
- Status
- Operational
- Owner
- EÜAŞ
- Country
- Türkiye
- Coordinates
- 36.562, 33.274
- Wikipedia
- Link
Carbon Footprint
tonnes / year
over ~80 yrs
Est. gCO2/kWh
Annual emissions equivalent to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Plants
About this plant
As Turkey’s 120th largest power generation facility, Gezende HES, with a capacity of 159.375 MW, plays a crucial role in the country’s energy landscape. This hydroelectric plant, operated by EÜAŞ, ranks 39th among 139 hydro plants in Turkey, contributing to approximately 0.17% of the national total capacity of 94,534 MW. Commissioned as part of Turkey’s ongoing efforts to harness renewable energy, Gezende HES utilizes cutting-edge hydro technology to convert the kinetic energy of water into electricity, a process that aligns perfectly with the nation’s commitment to sustainability. Geographically, the plant is situated in a region rich with energy potential, surrounded by several significant facilities that underscore the importance of diverse energy generation. Not far from Gezende HES is the Akkuyu Nuclear Power Plant, boasting a formidable capacity of 4800 MW, which marks a significant investment in nuclear energy for Turkey. Additionally, the Gezende Dam, with a capacity of 159 MW, and the Alaköprü Dam at 31.568 MW, further contribute to the local hydro landscape. The presence of solar plants like Dayıcık and Şeyhömer, with capacities of 6.6 MW and 5.5 MW respectively, showcases the area’s transition toward a broad energy mix that includes renewable sources. Nationally, Turkey’s energy profile is still dominated by gas, but the increasing share of hydroelectric power is indicative of a shift toward more sustainable practices. EÜAŞ’s operation of Gezende HES reflects a strategic move to diversify energy sources and enhance energy security. Looking forward, Gezende HES is well-positioned to contribute to Turkey’s ambitious energy goals, playing an essential role in meeting increasing electricity demands while minimizing environmental impacts.
More Hydroelectric plants
Spotted an error?
Our data is community-verified. If any detail on this page looks wrong or out of date, let us know and we will review it.