- Fuel Type
- Hydroelectric
- Capacity
- 210 MW
- Commissioned
- 2010
- Status
- Operational
- Owner
- Barki Tojik
- Country
- TJK
- Coordinates
- 37.884, 68.937
Carbon Footprint
tonnes / year
over ~80 yrs
Est. gCO2/kWh
Annual emissions equivalent to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Plants
About this plant
Ranked as the fifth largest power generation facility in Tajikistan, Golovnaya stands out with a capacity of 210 MW, contributing approximately 3.96% to the national energy grid. This hydroelectric plant, operated by Barki Tojik, plays a crucial role in bolstering the country’s renewable energy profile, which is heavily dominated by hydroelectric sources. With a total national capacity of 5,296 MW and only ten plants in operation, Golovnaya’s significance is amplified as one of the top contributors among its peers. The facility is notable for its advanced hydro generation technology, harnessing the powerful flow of the nearby river to produce clean electricity. The plant’s operations are critical not only for local communities but also for meeting the broader demands of the national grid. In terms of regional context, Golovnaya is surrounded by other significant hydro plants such as Sangtuda 1 and Baipaza, with respective capacities of 700 MW and 600 MW. These plants collectively form a robust hydro energy cluster, emphasizing the importance of hydroelectric power in Tajikistan’s energy landscape. Additionally, Yavan, an oil-fired facility with a capacity of 180 MW, adds diversity to the local energy mix, although its contribution pales in comparison to the dominant hydroelectric sources. As the fourth largest hydro plant in the country, Golovnaya exemplifies the nation’s commitment to renewable energy. The geographic placement of Golovnaya, nestled among a few other hydro facilities, enhances its strategic importance in the region. The plant was commissioned in the early 2000s and reflects Tajikistan’s ongoing efforts to harness its abundant water resources for energy production. Looking ahead, Golovnaya is set to play an even more pivotal role in Tajikistan’s energy future, especially as the country aims to reduce its reliance on fossil fuels and increase its renewable energy capacity.
More Hydroelectric plants
Spotted an error?
Our data is community-verified. If any detail on this page looks wrong or out of date, let us know and we will review it.