Inner Sound Phase 1A (MeyGen) is a 6 MW wave and tidal power plant located in United Kingdom. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Wave and Tidal
- Capacity
- 6 MW
- Commissioned
- —
- Status
- Operational
- Owner
- Atlantis Resources
- Country
- United Kingdom
- Coordinates
- 58.742, -3.116
Carbon Footprint
tonnes / year
over ~25 yrs
Est. gCO2/kWh
Annual emissions equivalent to
Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator
Nearby Plants
Peterhead Power Station
United Kingdom · Natural Gas
Peterhead
United Kingdom · Natural Gas
Moray East Offshore Wind Farm
United Kingdom · Wind
Beatrice
United Kingdom · Wind
Beatrice Wind Farm
United Kingdom · Wind
Foyers Power Station
United Kingdom · Hydroelectric
About this plant
Inner Sound Phase 1A (MeyGen) is a 6 MW wave and tidal power plant in the United Kingdom, operated by Atlantis Resources.
Ranked #2 of 7 wave and tidal plants in the United Kingdom. Its 6 MW constitutes 15.71% of the United Kingdom’s total wave and tidal capacity of 38 MW. The largest wave and tidal plant in the United Kingdom is Hayle Wave Hub (Test Site) at 23 MW, making this facility 3.8 times smaller.
Nearby plants include Camster (50 MW, Wind), Causeymire (48.3 MW, Wind), and Halsary Wind Farm (34 MW, Wind). The facility is located in the Highlands, approximately 200 km north of Inverness.
More Wave and Tidal plants
Spotted an error?
Our data is community-verified. If any detail on this page looks wrong or out of date, let us know and we will review it.