Pakistan

Kot Addu Power Company ltd. — 1,368 MW Hydroelectric

Hydroelectric Renewable Verified

Kot Addu Power Company ltd. is a 1,368 MW hydro power plant located in Pakistan. View location, capacity, and technical details.

Capacity
1,368 MW

Installed

Commissioned
1996

Year online

Owner
Water and Power Development Authority (WAPDA)

Operator

Location
30.45, 70.98

Coordinates

Insights

#16
largest in Pakistan
#196
largest Hydroelectric worldwide
#1,473
largest worldwide
1996
12 yrs newer than avg
11
operated by Water and Power…
12
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
1,368 MW
Commissioned
1996
Status
Operational
Owner
Water and Power Development Authority (WAPDA)
Country
Pakistan
Coordinates
30.445, 70.981

Carbon Footprint

Annual CO₂
115,043 t

tonnes / year

Lifetime CO₂
9,203,466 t

over ~80 yrs

Intensity
24 g

Est. gCO2/kWh

Annual emissions equivalent to

25,009
cars per year
15,339
homes per year
5,229,242
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Plants

About this plant

Kot Addu Power Company Ltd. (KAPCO) is a pivotal power generation facility located in the Punjab province of Pakistan, contributing significantly to the country’s energy landscape. With a total capacity of 1,368 megawatts (MW), KAPCO plays a crucial role in meeting the electricity demands of a growing population and industrial sector. The plant is owned by the Water and Power Development Authority (WAPDA), a governmental body responsible for the development of water and electricity resources in Pakistan. This facility primarily utilizes hydroelectric power, harnessing the energy from flowing water to generate electricity, which is a renewable and environmentally friendly source of energy. Hydro power is derived from the potential energy of water stored in reservoirs or flowing in rivers, and it is converted into mechanical energy through turbines. This process results in the generation of electrical energy without the combustion of fossil fuels, leading to lower greenhouse gas emissions compared to traditional thermal power plants. The operational efficiency of hydroelectric plants like KAPCO is generally high, with minimal operational costs once constructed, making it an economically viable option for power generation. KAPCO’s strategic location along the banks of the Indus River enhances its ability to tap into substantial water resources, which is vital for its operations. The facility has been designed to operate with a focus on sustainability, ensuring that water usage is optimized and that the ecological balance of the surrounding region is preserved. The environmental impact of hydroelectric power plants can be complex; while they generally produce fewer emissions than fossil fuel plants, they can also affect local ecosystems and aquatic habitats. However, KAPCO has implemented various measures to mitigate these effects, including fish ladders to facilitate the migration of aquatic species and monitoring programs to assess environmental health. Regionally, KAPCO is significant not only for its direct contributions to the national grid but also as a catalyst for economic development in the surrounding areas. The plant has created numerous jobs, both directly and indirectly, and has stimulated local businesses by increasing demand for services and goods. Additionally, by providing a stable and reliable power source, KAPCO supports industrial growth and enhances the quality of life for residents in the region. As Pakistan continues to navigate its energy challenges, KAPCO stands as a testament to the potential of utilizing renewable resources for sustainable development. Its role in the broader context of the country’s energy strategy underscores the importance of diversifying energy sources and investing in clean and renewable energy technologies to ensure energy security and environmental sustainability.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.