Argentina

Salto Grande Dam — 1,890 MW Hydroelectric

Hydroelectric Renewable Verified

Salto Grande Dam is a 1,890 MW hydro power plant located in Argentina. View location, capacity, and technical details.

Capacity
1,890 MW

Installed

Commissioned
1974

Year online

Owner
Salto Grande Binational Commission

Operator

Location
-31.27, -57.94

Coordinates

Insights

#5
largest in Argentina
#121
largest Hydroelectric worldwide
#932
largest worldwide
1974
10 yrs older than avg
1
operated by Salto Grande Binational…
6
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
1,890 MW
Commissioned
1974
Status
Operational
Owner
Salto Grande Binational Commission
Country
Argentina
Coordinates
-31.275, -57.939
Wikipedia
Link

Carbon Footprint

Annual CO₂
158,941 t

tonnes / year

Lifetime CO₂
12,715,315 t

over ~80 yrs

Intensity
24 g

Est. gCO2/kWh

Annual emissions equivalent to

34,552
cars per year
21,192
homes per year
7,224,611
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Plants

About this plant

The Salto Grande Dam, located on the Uruguay River between Argentina and Uruguay, is a significant hydroelectric power plant commissioned in 1974. With a total installed capacity of 1,890 megawatts (MW), it serves as a cornerstone of Argentina’s energy sector, contributing substantially to the country’s electricity supply and stability. The facility plays a dual role in energy generation and flood control, providing essential services to the surrounding regions.

As a hydroelectric power plant, Salto Grande utilizes the potential energy of water to produce electricity. Water from the Uruguay River is channeled through the dam, where it passes through turbines that convert the kinetic energy of flowing water into electrical energy. The operation of the dam is predicated on the principles of hydrodynamics, relying on the gravitational pull of water to generate power efficiently. The renewable nature of hydroelectric energy makes Salto Grande a vital part of Argentina’s strategy to reduce reliance on fossil fuels and lower greenhouse gas emissions, aligning with global sustainability goals.

The environmental impact of the Salto Grande Dam has been a subject of study and debate since its inception. While it provides a clean source of energy and helps mitigate carbon emissions, the construction of the dam also led to significant ecological changes in the region. The inundation of land for the reservoir altered local ecosystems and displaced communities, raising concerns about biodiversity loss and the social implications of such large-scale projects. Ongoing assessments and management strategies aim to address these challenges, balancing energy production with environmental stewardship.

Regionally, the Salto Grande Dam holds strategic importance not just for Argentina but also for Uruguay, as it operates as a shared resource between the two nations. The dam facilitates cross-border electricity trade, allowing both countries to optimize their energy resources and manage supply effectively. This collaboration enhances energy security and fosters economic ties between Argentina and Uruguay. Additionally, the dam plays a crucial role in regional flood control, helping to manage water levels in the Uruguay River and minimizing the risk of flooding in adjacent areas.

In conclusion, the Salto Grande Dam stands as a pivotal asset in Argentina’s energy landscape. With its substantial hydroelectric capacity, it supports the country’s commitment to renewable energy while simultaneously serving as a crucial tool for regional cooperation and environmental management. As the world moves towards a more sustainable energy future, the importance of such infrastructure will continue to grow, highlighting the need for responsible management and innovative solutions in the energy sector.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail on this page looks wrong or out of date, let us know and we will review it.