Sir Adam Beck 2 is a 1,499 MW hydro power plant located in Canada. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 1,499 MW
- Commissioned
- 1954
- Status
- Operational
- Owner
- Ontario Power Generation
- Country
- Canada
- Coordinates
- 43.146, -79.044
Carbon Footprint
tonnes / year
over ~80 yrs
Est. gCO2/kWh
Annual emissions equivalent to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Plants
Darlington
Canada · Nuclear
Darlington Nuclear Generating Station
Canada · Nuclear
Pickering Nuclear Generating Station
Canada · Nuclear
Pickering B
Canada · Nuclear
Sir Adam Beck II Generating Station
Canada · Hydroelectric
Pickering A
Canada · Nuclear
About this plant
The Sir Adam Beck 2 power plant, located in Ontario, Canada, is a significant hydroelectric facility with a total installed capacity of 1,499 megawatts (MW). It plays a crucial role in the country’s energy sector, contributing to Ontario’s electricity needs and supporting the transition to renewable energy sources. As a hydroelectric plant, Sir Adam Beck 2 harnesses the kinetic energy of flowing water to generate electricity, making it a pivotal element of Canada’s strategy to reduce greenhouse gas emissions and promote sustainable energy production.
Hydroelectric power, the fuel type utilized by Sir Adam Beck 2, is derived from the potential energy of water stored in reservoirs or flowing in rivers. The plant operates primarily on the Niagara River, taking advantage of the natural elevation changes and flow rates to produce electricity. The technology involved in hydroelectric power generation typically includes turbines and generators that convert the mechanical energy of moving water into electrical energy. Sir Adam Beck 2 is designed to operate efficiently under varying water flow conditions, ensuring a reliable power supply to the grid.
The environmental impact of hydroelectric power plants such as Sir Adam Beck 2 is generally lower than that of fossil fuel-based power generation. However, it is not without challenges. The construction and operation of large dams and reservoirs can disrupt local ecosystems, affect aquatic life, and alter water quality. Nevertheless, hydroelectric power is considered a cleaner alternative to coal and natural gas, as it produces no direct emissions during operation. Efforts have been made at Sir Adam Beck 2 to minimize environmental impact, including fish passage systems and habitat preservation initiatives.
Regionally, Sir Adam Beck 2 is significant not only for its power generation capacity but also for its role in supporting local economies and providing jobs. It serves as a cornerstone of Ontario’s electricity supply and is instrumental in balancing the grid, especially during peak demand periods. The plant’s output contributes to the stability and reliability of the electricity supply in Ontario, which is vital for residential, commercial, and industrial consumers.
Overall, the Sir Adam Beck 2 power plant is a key asset in Canada’s hydroelectric energy landscape. It underscores the country’s commitment to harnessing renewable resources while addressing environmental concerns and supporting economic development. With its substantial capacity and technological advancements, the plant exemplifies the potential of hydroelectric power to meet contemporary energy demands in a sustainable manner.
More Hydroelectric plants
Spotted an error?
Our data is community-verified. If any detail on this page looks wrong or out of date, let us know and we will review it.