Surgutskaya GRES-2 is a 8,865 MW gas power station located in Russia, commissioned in 1979. It is one of the facilities tracked in the World Power Plants database.
Installed
Year online
Operator
Coordinates
Location
Technical Details
- Fuel Type
- Gas
- Capacity
- 8,865 MW
- Commissioned
- 1979
- Status
- Operational
- Owner
- PJSC "Unipro"
- Country
- Russia
- Coordinates
- 61.279, 73.489
- Wikipedia
- Link
About this plant
Surgutskaya GRES-2 is a significant gas-fired thermal power plant located in the city of Surgut, Russia. With a total installed capacity of 8,865 megawatts (MW), it stands as one of the largest power plants in the country and plays a crucial role in Russia’s energy landscape. Commissioned in 1979, the plant is owned and operated by PJSC “Unipro,” a prominent player in the Russian energy market. The facility primarily utilizes natural gas as its fuel source, which is known for being one of the cleaner fossil fuels available for power generation.
As a gas-fired power plant, Surgutskaya GRES-2 contributes significantly to the energy supply in the region and across the country. It is part of the Unified Energy System of Russia and is integral to ensuring grid stability and reliability. The plant’s capacity enables it to meet the electricity demands of millions of households and numerous industries, particularly in the western Siberian region where it is located. The strategic importance of Surgutskaya GRES-2 is underscored by its ability to provide both base load and peak load power, making it a versatile asset in the energy mix of Russia.
Natural gas, the primary fuel for Surgutskaya GRES-2, has several technical advantages. It burns more cleanly than coal or oil, producing significantly lower amounts of sulfur dioxide (SO2), particulate matter, and carbon dioxide (CO2) per unit of energy generated. This makes it a relatively more environmentally friendly option within the fossil fuel category. Moreover, advancements in gas turbine technology at the plant have improved efficiency rates, allowing for greater electricity output with lower fuel consumption. The utilization of combined cycle technology at Surgutskaya GRES-2 enhances its efficiency further by using waste heat from gas turbines to generate additional electricity through steam turbines.
Despite its advantages, the environmental impact of gas-fired power plants like Surgutskaya GRES-2 cannot be overlooked. While they produce fewer emissions than coal-fired plants, they still contribute to greenhouse gas emissions and other environmental concerns. The extraction and transportation of natural gas also pose risks, including potential methane leaks, which could negate some of the environmental benefits associated with its use. As such, balancing the economic and environmental impacts remains a critical consideration for the future operations of the plant and the energy sector at large.
Regionally, Surgutskaya GRES-2 serves as a vital part of the local economy, providing jobs and supporting ancillary industries related to energy generation. Its operation not only helps to stabilize the electricity grid but also enhances the overall energy security of Russia, particularly in the context of global energy markets and geopolitical considerations. As Russia continues to navigate its energy transition, the role of facilities like Surgutskaya GRES-2 will be pivotal in determining the balance between energy needs and environmental responsibilities.
More Gas plants
Spotted an error?
Our data is community-verified. If any detail on this page looks wrong or out of date, let us know and we will review it.