{"id":4429,"date":"2026-08-04T13:11:04","date_gmt":"2026-08-04T13:11:04","guid":{"rendered":"https:\/\/test.worldpowerplants.com\/pt\/plant\/yusufeli-dam\/"},"modified":"2026-08-04T13:11:04","modified_gmt":"2026-08-04T13:11:04","slug":"yusufeli-dam","status":"publish","type":"wpp_plant","link":"https:\/\/test.worldpowerplants.com\/pt\/plant\/yusufeli-dam\/","title":{"rendered":"Yusufeli Dam"},"content":{"rendered":"<p>The Yusufeli Dam, located in Turkey at coordinates 40.8161, 41.6447, represents a significant achievement in hydroelectric energy generation, boasting a capacity of 540 MW. Commissioned in 2022, this modern facility is pivotal for Turkey&#8217;s energy strategy, which seeks to reduce reliance on imported fossil fuels and enhance domestic energy production. Utilizing advanced dam technology, the Yusufeli Dam captures and stores water from the surrounding rivers, generating electricity in a clean and sustainable manner. This hydro power plant is essential for bolstering the local energy grid, contributing to energy security, and providing reliable power to nearby communities. As Turkey continues to invest in renewable energy projects, the Yusufeli Dam plays a strategic role in the country&#8217;s transition towards a more sustainable energy future. The significance of this facility extends beyond its generation capacity; it also plays a role in flood control, irrigation support, and ecological preservation, showcasing the multifaceted benefits of hydroelectric power in the region.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Yusufeli Dam, located in Turkey at coordinates 40.8161, 41.6447, represents a significant achievement in hydroelectric energy generation, boasting a capacity of 540 MW. Commissioned in 2022, this modern facility is pivotal for Turkey&#8217;s energy strategy, which seeks to reduce reliance on imported fossil fuels and enhance domestic energy production. Utilizing advanced dam technology, the [&hellip;]<\/p>\n","protected":false},"featured_media":0,"template":"","meta":{"wpp_capacity_mw":540,"wpp_operator":"State Hydraulic Works (DSI)","wpp_fuel_primary":"Hydro","wpp_commissioned_year":2022,"wpp_country_name":"Turquia","wpp_country_code":"TUR","wpp_status_val":"Operational","wpp_lat":40.816111111,"wpp_lng":41.644722222,"wpp_source_id":"48398","wpp_last_verified":"2026-02-28T19:35:24.71152+00:00","wpp_verification_source":"wikidata","wpp_data_quality":9,"wpp_wikipedia":"https:\/\/en.wikipedia.org\/wiki\/Yusufeli_Dam","footnotes":""},"wpp_fuel":[],"wpp_location":[],"wpp_status":[],"class_list":["post-4429","wpp_plant","type-wpp_plant","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/test.worldpowerplants.com\/pt\/wp-json\/wp\/v2\/wpp_plant\/4429","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/test.worldpowerplants.com\/pt\/wp-json\/wp\/v2\/wpp_plant"}],"about":[{"href":"https:\/\/test.worldpowerplants.com\/pt\/wp-json\/wp\/v2\/types\/wpp_plant"}],"version-history":[{"count":0,"href":"https:\/\/test.worldpowerplants.com\/pt\/wp-json\/wp\/v2\/wpp_plant\/4429\/revisions"}],"wp:attachment":[{"href":"https:\/\/test.worldpowerplants.com\/pt\/wp-json\/wp\/v2\/media?parent=4429"}],"wp:term":[{"taxonomy":"wpp_fuel","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/pt\/wp-json\/wp\/v2\/wpp_fuel?post=4429"},{"taxonomy":"wpp_location","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/pt\/wp-json\/wp\/v2\/wpp_location?post=4429"},{"taxonomy":"wpp_status","embeddable":true,"href":"https:\/\/test.worldpowerplants.com\/pt\/wp-json\/wp\/v2\/wpp_status?post=4429"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}