SRB

TENT A — 1,730 MW Coal

Coal Verified

TENT A is a 1,730 MW coal power plant located in Serbia. View location, capacity, and technical details.

Capacity
1,730 MW

Installed

Commissioned
1970

Year online

Owner
EPS (Electric Power Industry of Serbia)

Operator

Location
44.67, 20.16

Coordinates

Insights

#1
largest in %s
#409
largest %s worldwide
#1,066
largest worldwide
1970
%d yrs older than avg
2
operated by %s
4
plants within 100 km

Technical Details

Fuel Type
Coal
Capacity
1,730 MW
Commissioned
1970
Status
Operational
Owner
EPS (Electric Power Industry of Serbia)
Country
SRB
Coordinates
44.671, 20.159

Estimated Carbon Footprint

Annual CO₂
6.8M t

tonnes / year

Lifetime CO₂
273.4M t

over ~%d yrs

Intensity
820 g

gCO₂ per kWh

Annual emissions equal to

1.5M
cars / year
911,309
homes / year
310.7M
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

TENT A, located in Serbia, is a significant coal-fired power plant with a total generation capacity of 1730 megawatts (MW). It plays a crucial role in the country’s energy sector, serving as one of the primary sources of electricity for the Serbian grid. Operated by the state-owned utility company Elektroprivreda Srbije (EPS), TENT A contributes to approximately 50% of Serbia’s electricity production, highlighting its importance in meeting the nation’s energy demands and providing a stable supply of power for both residential and industrial consumers.

The power plant utilizes coal as its primary fuel source, which is abundant in Serbia. Coal-fired power generation, while economically advantageous due to lower fuel costs, presents several technical considerations. TENT A employs conventional steam turbine technology, where coal is combusted to produce steam that drives turbines to generate electricity. The facility’s operational efficiency and output are influenced by the type and quality of coal used, which in Serbia primarily consists of lignite, a lower-grade coal with higher moisture content and lower energy density compared to anthracite or bituminous coal.

Despite its pivotal role in energy production, TENT A and similar coal-fired plants face scrutiny regarding their environmental impact. The combustion of coal releases significant amounts of carbon dioxide (CO2), a greenhouse gas contributing to climate change. Additionally, coal combustion generates other pollutants, including sulfur dioxide (SO2), nitrogen oxides (NOx), and particulate matter, which can have adverse effects on air quality and public health. In recent years, there has been increasing pressure on the Serbian government and EPS to implement cleaner technologies and reduce emissions from TENT A, as part of broader efforts to transition towards more sustainable energy sources and comply with European Union environmental standards.

Regionally, TENT A serves as a backbone for not only Serbia’s energy infrastructure but also for neighboring countries. The power produced at TENT A is transmitted across regional grids, enhancing energy security and stability within the Balkans. This interconnectivity allows for electricity trade with neighboring countries, thereby supporting regional economic development and cooperation in energy management. However, the reliance on coal for power generation also raises concerns about energy diversification and the need for investments in renewable energy sources, particularly in light of global trends towards decarbonization.

In summary, TENT A is a crucial asset within Serbia’s energy landscape, characterized by its substantial capacity and reliance on coal. While it plays an essential role in electricity generation, the challenges related to environmental impact and the need for modernization reflect the complexities of balancing energy needs with sustainability goals in the region.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.