Centrale Manic-5 is a 1,596 MW hydro power plant located in Canada. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 1,596 MW
- Commissioned
- 1968
- Status
- Operational
- Owner
- Hydro-Québec
- Country
- Canada
- Coordinates
- 50.640, -68.727
- Wikipedia
- Link
Estimated Carbon Footprint
tonnes / year
over ~80 yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
Manic-5
Canada · Hydroelectric
René-Lévesque (Manic-3)
Canada · Hydroelectric
Jean-Lesage (Manic-2)
Canada · Hydroelectric
Bersimis-1
Canada · Hydroelectric
Manic-5-PA
Canada · Hydroelectric
Outardes-3
Canada · Hydroelectric
About this plant
Centrale Manic-5 is a significant hydroelectric power plant located in the province of Quebec, Canada. With an impressive capacity of 1596 megawatts (MW), it plays a pivotal role in the country’s energy sector, particularly in providing renewable energy and supporting the national grid. Owned and operated by Hydro-Québec, the plant is strategically positioned on the Manicouagan River, benefiting from the abundant water resources that characterize this region. The plant was completed in 1968 and has since been a cornerstone in Quebec’s extensive hydroelectric power generation system, which is largely recognized for its environmental sustainability and low greenhouse gas emissions compared to fossil fuel-based energy sources.
Centrale Manic-5 utilizes hydroelectric power, which is generated by harnessing the energy of flowing water. The process involves the construction of a dam to create a reservoir, where water is stored and subsequently released through turbines to generate electricity. This method of power generation is renewable, as it relies on the natural water cycle, and does not deplete resources or produce air pollutants, making it a cleaner alternative to traditional energy sources such as coal or natural gas. In addition, the hydroelectric process at Centrale Manic-5 allows for significant energy storage, enabling the plant to provide reliable power during peak demand periods and to support grid stability.
The environmental impact of Centrale Manic-5 is generally positive when compared to fossil fuel plants, as it contributes to a reduction in carbon emissions. However, like many large hydroelectric projects, it has not been without controversy. The construction of the dam led to the flooding of large areas, which can disrupt local ecosystems and wildlife habitats. Efforts have been made to mitigate these impacts through environmental assessments and ongoing monitoring of the surrounding ecosystems. Hydro-Québec has engaged in various initiatives to promote biodiversity and to address the ecological concerns raised by the local communities and environmental groups.
Regionally, Centrale Manic-5 is of considerable significance. It not only provides substantial electricity to Quebec, which is known for its reliance on hydroelectric power, but also contributes to the province’s economy through job creation and the promotion of related industries. The plant supports local communities by providing a stable source of energy, which is essential for both residential and industrial consumers. Additionally, as part of Hydro-Québec’s larger network of hydroelectric facilities, Centrale Manic-5 plays a critical role in achieving Canada’s energy goals, including the transition to renewable energy sources and the reduction of greenhouse gas emissions. Overall, Centrale Manic-5 exemplifies the potential of hydroelectric power to meet energy needs sustainably while minimizing environmental impact.
More Hydroelectric plants
Spotted an error?