FJI

Labasa Sugar Mill — 10 MW Biomass

Biomass Renewable Verified

Labasa Sugar Mill is a 10 MW biomass power plant located in Fiji. View location, capacity, and technical details.

Capacity
10 MW

Installed

Commissioned
2015

Year online

Owner
Fiji Sugar Corporation

Operator

Location
-16.43, 179.39

Coordinates

Insights

#6
largest in %s
#706
largest %s worldwide
#23,756
largest worldwide
2015
%d yrs newer than avg
2
operated by %s
0
plants within 100 km

Technical Details

Fuel Type
Biomass
Capacity
10 MW
Commissioned
2015
Status
Operational
Owner
Fiji Sugar Corporation
Country
FJI
Coordinates
-16.430, 179.389

Estimated Carbon Footprint

Annual CO₂
13,096 t

tonnes / year

Lifetime CO₂
327,405 t

over ~%d yrs

Intensity
230 g

gCO₂ per kWh

Annual emissions equal to

2,847
cars / year
1,746
homes / year
595,282
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

Labasa Sugar Mill is a 10 MW biomass power plant in Fiji, operated by Fiji Sugar Corporation and commissioned in 2015. It is one of three biomass plants in Fiji, contributing to a total biomass capacity of 24 MW.

Ranked #1 of 3 biomass plants in Fiji, Labasa Sugar Mill represents 41.15% of the country’s biomass capacity. The largest biomass plant in Fiji is Labasa Sugar Mill itself at 10 MW, making it the only facility of its size.

There are no nearby plants within 50 km of Labasa Sugar Mill. The facility is located in the Northern Division of Fiji, approximately 10 km from Labasa Town.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.