CTCC AS PONTES GRUPO 5 is a 856 MW gas power plant located in Spain. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Natural Gas
- Capacity
- 856 MW
- Commissioned
- 2008
- Status
- Operational
- Owner
- ENDESA GENERACION S.A.
- Country
- Spain
- Coordinates
- 43.445, -7.862
Estimated Carbon Footprint
tonnes / year
over ~%d yrs
gCO₂ per kWh
Annual emissions equal to
Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator
Nearby Stations
COMPOSTILLA II GR 5
Spain · Coal
Central de Ciclo Combinado Endesa - As Pontes
Spain · Natural Gas
MEIRAMA GRUPO 1
Spain · Coal
NARCEA GRUPO 3
Spain · Coal
San Esteban II Grupo 1
Spain · Hydroelectric
CTCC SABON GRUPO 3
Spain · Natural Gas
About this plant
CTCC AS PONTES GRUPO 5 is a significant gas-fired power plant located in Spain, with a generation capacity of 855.67 megawatts (MW). Owned by ENDESA GENERACION S.A., this facility was commissioned in 2008 and has since played a pivotal role in supporting Spain’s energy sector, particularly in the transition towards more sustainable energy sources. As part of the broader energy landscape, the plant contributes to both base-load and peak-load power generation, ensuring a reliable electricity supply for the region.
The plant primarily utilizes natural gas as its fuel source, which is known for being a cleaner alternative to coal and oil. Natural gas combustion produces lower emissions of sulfur dioxide (SO2) and particulate matter, contributing to improved air quality compared to traditional fossil fuels. Moreover, the combustion of natural gas emits significantly less carbon dioxide (CO2) per unit of energy produced, which aligns with Spain’s commitments to reduce greenhouse gas emissions and mitigate climate change impacts. The technology employed at CTCC AS PONTES GRUPO 5 includes advanced gas turbine systems that enhance efficiency and reduce operational costs, making it a vital asset in the country’s energy portfolio.
The environmental impact of CTCC AS PONTES GRUPO 5 is a noteworthy aspect of its operation. While natural gas is a fossil fuel, its role in the energy transition is largely viewed as a bridge towards renewable energy sources such as wind and solar. The facility’s ability to ramp up production quickly makes it an essential player in managing the intermittency associated with renewable energy generation. Additionally, by displacing coal-fired power plants, CTCC AS PONTES GRUPO 5 contributes to the reduction of harmful emissions and overall environmental footprint in the region.
Regionally, the plant holds significance not only in terms of energy generation but also in economic terms. It provides jobs during both the construction phase and ongoing operations, supporting local economies. Furthermore, the stability in electricity supply facilitated by the plant allows for the growth of local industries and businesses that rely on consistent energy access. As Spain continues to evolve its energy strategy, CTCC AS PONTES GRUPO 5 remains a critical component of the national grid, supporting both current demands and future energy initiatives. Its operation complements the increasing integration of renewable energy sources, positioning Spain towards a more sustainable and diversified energy future.
More %s plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.