Spain

MEIRAMA GRUPO 1 — 557 MW Coal

Coal Verified

MEIRAMA GRUPO 1 is a 557 MW coal power plant located in Spain. View location, capacity, and technical details.

Capacity
557 MW

Installed

Commissioned
1980

Year online

Owner
GAS NATURAL FENOSA GENERACION S.L.U.

Operator

Location
43.17, -8.41

Coordinates

Insights

#80
largest in %s
#1,532
largest %s worldwide
#4,339
largest worldwide
1980
%d yrs older than avg
25
operated by %s
65
plants within 100 km

Technical Details

Fuel Type
Coal
Capacity
557 MW
Commissioned
1980
Status
Operational
Owner
GAS NATURAL FENOSA GENERACION S.L.U.
Country
Spain
Coordinates
43.169, -8.411

Estimated Carbon Footprint

Annual CO₂
2.2M t

tonnes / year

Lifetime CO₂
88.1M t

over ~%d yrs

Intensity
820 g

gCO₂ per kWh

Annual emissions equal to

478,557
cars / year
293,515
homes / year
100.1M
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

Meirama Grupo 1 is a coal-fired power plant located in Spain with a significant installed capacity of 557.2 megawatts (MW). Commissioned in 1980, the plant is owned and operated by Gas Natural Fenosa Generación S.L.U., a prominent energy company in Spain. As a part of the country’s energy infrastructure, Meirama Grupo 1 plays a crucial role in providing a stable source of electricity, particularly during peak demand periods. Its capacity allows it to contribute substantially to the regional grid, helping to ensure energy security and reliability for consumers and businesses alike.

The use of coal as fuel for the Meirama Grupo 1 plant is notable, especially given the global shift towards renewable energy sources. Coal is known for its high energy density, which enables power plants to generate large amounts of electricity efficiently. However, the combustion of coal also results in the emission of greenhouse gases and other pollutants, raising concerns about its environmental impact. In the context of Spain’s energy policy, which has been increasingly focused on reducing carbon emissions and transitioning to cleaner energy sources, the role of coal-fired plants like Meirama Grupo 1 has come under scrutiny. This has led to discussions regarding the future of such plants, as Spain aims to meet its climate goals and commitments under international agreements.

In terms of environmental impact, coal-fired power plants are associated with significant emissions of carbon dioxide (CO2), sulfur dioxide (SO2), and particulate matter, which can contribute to air quality issues and climate change. In recent years, the Spanish government has implemented measures to promote cleaner energy production and reduce reliance on coal. These initiatives include investments in renewable energy technologies and incentives for transitioning towards less polluting energy sources. Despite these challenges, Meirama Grupo 1 continues to operate, providing a substantial portion of the electricity supply in its region, and contributing to the overall mix of energy sources in Spain.

Regionally, Meirama Grupo 1 holds significance not only as a power provider but also as a source of employment and economic activity. The plant supports local jobs and contributes to the economy through its operations and maintenance. Furthermore, its strategic location allows it to connect to the national grid effectively, facilitating energy distribution across various regions of Spain. As the country navigates its energy transition, the future of coal-fired power plants like Meirama Grupo 1 will be crucial in balancing energy demands, environmental responsibilities, and economic considerations, making it a key player in Spain’s evolving energy landscape.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.