Canada

Waneta Expansion — 335 MW Hydroelectric

Hydroelectric Renewable Verified

Waneta Expansion is a 335 MW hydro power plant located in Canada. View location, capacity, and technical details.

Capacity
335 MW

Installed

Commissioned
2015

Year online

Owner
Fortis Inc (51%) / Columbia Power (32.5%) / Columbia Basin Trust (16.5%)

Operator

Location
49.00, -117.62

Coordinates

Insights

#114
largest in Canada
#1,016
largest Hydroelectric worldwide
#5,760
largest worldwide
2015
31 yrs newer than avg
1
operated by Fortis Inc (51%)…
20
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
335 MW
Commissioned
2015
Status
Operational
Owner
Fortis Inc (51%) / Columbia Power (32.5%) / Columbia Basin Trust (16.5%)
Country
Canada
Coordinates
49.005, -117.616

Carbon Footprint

Annual CO₂
28,172 t

tonnes / year

Lifetime CO₂
2,253,773 t

over ~80 yrs

Intensity
24 g

Est. gCO2/kWh

Annual emissions equivalent to

6,124
cars per year
3,756
homes per year
1,280,553
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Plants

About this plant

The Waneta Expansion is a significant hydroelectric power plant located in Canada, specifically at coordinates 49.0047, -117.6160. As part of the Columbia Basin hydroelectric system, the plant plays a crucial role in the national energy mix, contributing to Canada’s commitment to renewable energy sources and sustainability. With a capacity of 335 MW, the Waneta Expansion enhances the region’s ability to generate clean energy while reducing reliance on fossil fuels. The power plant utilizes advanced hydro technology, harnessing the kinetic energy of flowing water to produce electricity efficiently. The facility operates under the ownership of Fortis Inc (51%), Columbia Power (32.5%), and Columbia Basin Trust (16.5%), demonstrating a collaborative approach to energy generation in the area. Positioned in British Columbia, the Waneta Expansion not only supports the local grid by providing a stable energy supply but also reinforces the province’s strategy to prioritize renewable resources. The importance of this facility is amplified by British Columbia’s ambitious energy policies aimed at reducing greenhouse gas emissions and promoting sustainable development. The hydroelectric technology employed in the Waneta Expansion ensures minimal environmental impact while maximizing energy output, aligning with the global shift towards greener energy solutions. As a result, the Waneta Expansion stands as a pivotal contributor to both the local and national energy landscape, showcasing the effectiveness of hydroelectric power in meeting energy demands sustainably.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.