Venezuela

Leanardo Ruiz Pineda (San Agaton) — 300 MW Hydroelectric

Hydroelectric Renewable Verified

Leanardo Ruiz Pineda (San Agaton) is a 300 MW hydro power plant located in Venezuela. View location, capacity, and technical details.

Capacity
300 MW

Installed

Commissioned
2010

Year online

Owner
Electricidad de Caracas

Operator

Location
7.85, -71.71

Coordinates

Insights

#19
largest in Venezuela
#1,086
largest Hydroelectric worldwide
#6,026
largest worldwide
2010
26 yrs newer than avg
14
operated by Electricidad de Caracas
3
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
300 MW
Commissioned
2010
Status
Operational
Owner
Electricidad de Caracas
Country
Venezuela
Coordinates
7.854, -71.715

Estimated Carbon Footprint

Annual CO₂
25,229 t

tonnes / year

Lifetime CO₂
2,018,304 t

over ~80 yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

5,485
cars / year
3,364
homes / year
1,146,764
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

The Leanardo Ruiz Pineda hydro power plant, also known as San Agaton, plays a crucial role in Venezuela’s energy generation landscape. As a hydroelectric facility, it harnesses the power of flowing water to produce a substantial 300 MW capacity. This capacity is significant in the context of Venezuela’s energy mix, where hydroelectric power is traditionally a primary source of electricity, contributing to sustainable energy generation in the region. Located at coordinates 7.8535, -71.7146, the plant is strategically situated to capitalize on the country’s abundant water resources, making it an essential asset for both local and national energy grids. The technology employed in this power plant involves advanced hydroelectric systems, which efficiently convert kinetic energy from water into electrical energy. This renewable energy source not only supports the growing electricity demand in Venezuela but also aligns with the country’s broader energy policies aimed at promoting sustainable development and reducing reliance on fossil fuels. The Leanardo Ruiz Pineda power plant is integral to stabilizing the electric supply in the region, especially during peak demand periods, and serves as a testament to Venezuela’s commitment to leveraging its natural resources for energy generation. With the plant’s operational efficiency and capacity, it significantly contributes to the local grid’s stability and resilience, ensuring reliable electricity for communities and industries alike.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.