Bangladesh

Baghabari GT 1 — 223 MW Natural Gas

Natural Gas Verified

Baghabari GT 1 is a 223 MW gas power plant located in Bangladesh. View location, capacity, and technical details.

Capacity
223 MW

Installed

Commissioned
1999

Year online

Owner
Bangladesh Power Development Board

Operator

Location
24.14, 89.59

Coordinates

Insights

#16
largest in %s
#2,566
largest %s worldwide
#7,052
largest worldwide
1999
at fleet average
26
operated by %s
18
plants within 100 km

Technical Details

Fuel Type
Natural Gas
Capacity
223 MW
Commissioned
1999
Status
Operational
Owner
Bangladesh Power Development Board
Country
Bangladesh
Coordinates
24.136, 89.593

Estimated Carbon Footprint

Annual CO₂
430,742 t

tonnes / year

Lifetime CO₂
12.9M t

over ~%d yrs

Intensity
490 g

gCO₂ per kWh

Annual emissions equal to

93,640
cars / year
57,432
homes / year
19.6M
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

Baghabari GT 1 holds a prominent position in Bangladesh’s energy sector as the 16th largest power generation facility out of 57 in the country, boasting a capacity of 223 MW. This gas-fired plant accounts for 1.88% of Bangladesh’s total energy capacity, which stands at 11,840 MW, showcasing its importance in a landscape dominated by gas generation. As the 12th largest gas plant among 27, Baghabari GT 1 plays a crucial role in meeting the energy demands of a rapidly growing economy.

Utilizing advanced gas turbine technology, Baghabari GT 1 efficiently converts natural gas into electricity, providing a reliable and relatively cleaner energy source compared to traditional oil-fired plants. This facility operates alongside several notable nearby plants, including the Siddhirganj (Dutch Bangla), which has a substantial capacity of 520 MW, and other gas plants like Summit Power and Ullapara, which offer 80 MW and 11 MW, respectively. The presence of such a diverse array of facilities within a 50 km radius illustrates the energy cluster that Baghabari is part of, enhancing regional energy security and stability.

The Bangladeshi energy profile is shifting towards gas, which is now the dominant fuel type, overtaking oil and coal. Baghabari GT 1’s contribution is integral to this shift, helping to provide a steady supply of electricity that supports both residential and industrial needs in the region. The strategic location of this plant aids in reducing transmission losses and improving the efficiency of energy delivery to nearby urban centers.

Commissioned in 1999, Baghabari GT 1 has been operational for over two decades, reflecting a commitment to maintaining and upgrading its facilities to meet modern energy demands. The plant is operated by a dedicated team focused on maximizing output while ensuring environmental compliance and operational efficiency.

Looking ahead, Baghabari GT 1 is poised to play an even more significant role in Bangladesh’s energy landscape as the government pushes for further gas exploration and development. This facility not only serves as a backbone of the current energy supply but also represents the potential for future growth in clean energy initiatives, aligning with national goals for sustainability and energy independence.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.