Bangladesh

Bheramara GT (Unit-1 2 3) — 560 MW Oil

Oil Verified

Bheramara GT (Unit-1 2 3) is a 560 MW oil power plant located in Bangladesh. View location, capacity, and technical details.

Capacity
560 MW

Installed

Commissioned
1976

Year online

Owner
Bangladesh Power Development Board

Operator

Location
24.05, 89.02

Coordinates

Insights

#5
largest in Bangladesh
#152
largest Oil worldwide
#4,322
largest worldwide
1976
21 yrs older than avg
26
operated by Bangladesh Power Development…
9
plants within 100 km

Technical Details

Fuel Type
Oil
Capacity
560 MW
Commissioned
1976
Status
Operational
Owner
Bangladesh Power Development Board
Country
Bangladesh
Coordinates
24.049, 89.017

Carbon Footprint

Annual CO₂
1,275,456 t

tonnes / year

Lifetime CO₂
38,263,680 t

over ~30 yrs

Intensity
650 g

Est. gCO2/kWh

Annual emissions equivalent to

277,273
cars per year
170,061
homes per year
57,975,273
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Plants

About this plant

The Bheramara GT (Unit-1 2 3) power plant, commissioned in 1976, is a critical asset in Bangladesh’s energy sector, with a total installed capacity of 560 megawatts (MW). Located in the southwestern part of the country, this gas turbine power station plays a significant role in providing reliable electricity to meet the growing demands of both residential and industrial consumers. As Bangladesh continues to experience rapid economic growth and urbanization, the contribution of the Bheramara GT plant is essential in supporting the country’s development and ensuring energy security.

The Bheramara GT power plant primarily utilizes oil as its fuel source. Oil-fired power generation involves the combustion of fuel oil, which is a liquid petroleum product. This type of fuel is favored in certain regions due to its relatively high energy density and the infrastructure established for its transportation and storage. However, the reliance on oil also presents challenges, especially concerning price volatility in international oil markets. The combustion process in oil-fired power plants generates steam that drives turbines to produce electricity, making it a vital technology in the energy mix of Bangladesh.

From an environmental standpoint, oil-fired power plants like Bheramara GT are associated with several concerns. The combustion of oil releases various pollutants, including sulfur dioxide (SO2), nitrogen oxides (NOx), and particulate matter, which can have detrimental effects on air quality and public health. Additionally, greenhouse gas emissions from oil combustion contribute to climate change, raising the urgency for cleaner energy alternatives. As Bangladesh endeavors to transition towards more sustainable energy sources, the environmental impact of existing oil-based power plants is a critical consideration in energy policy and planning.

Regionally, the Bheramara GT power plant serves as a cornerstone for electricity supply in the southwestern region of Bangladesh, where the demand for power has surged due to increased industrial activity and population growth. The plant’s strategic location enhances its ability to deliver electricity to nearby areas, facilitating economic development and improving the quality of life for residents. Furthermore, the plant’s operational capacity helps stabilize the national grid, particularly during peak demand periods, thereby reducing the incidence of load shedding and power outages.

In conclusion, the Bheramara GT power plant represents a significant component of Bangladesh’s energy infrastructure, balancing the immediate need for power generation with the challenges posed by environmental impacts and fuel dependency. As the country progresses towards a more diversified energy portfolio, the role of such facilities will be crucial in shaping a sustainable energy future while addressing the pressing energy needs of its population.

More Oil plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.