Brazil

Celso Furtado (Antiga Termobahia Fase I) — 186 MW Natural Gas

Natural Gas Verified

Celso Furtado (Antiga Termobahia Fase I) is a 186 MW gas power plant located in Brazil. View location, capacity, and technical details.

Capacity
186 MW

Installed

Commissioned
2004

Year online

Owner
Petrobras

Operator

Location
-12.70, -38.57

Coordinates

Insights

#194
largest in %s
#2,708
largest %s worldwide
#7,705
largest worldwide
2004
%d yrs newer than avg
139
operated by %s
36
plants within 100 km

Technical Details

Fuel Type
Natural Gas
Capacity
186 MW
Commissioned
2004
Status
Operational
Owner
Petrobras
Country
Brazil
Coordinates
-12.704, -38.567

Estimated Carbon Footprint

Annual CO₂
359,063 t

tonnes / year

Lifetime CO₂
10.8M t

over ~%d yrs

Intensity
490 g

gCO₂ per kWh

Annual emissions equal to

78,057
cars / year
47,875
homes / year
16.3M
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

Ranked as the 194th largest power generation facility out of 2,402 in Brazil, the Celso Furtado (Antiga Termobahia Fase I) plays a crucial role in the country’s energy landscape. With a capacity of 185.891 MW, this gas-fired plant, commissioned in 2004, contributes approximately 0.07% of Brazil’s total power capacity of 250,382 MW. While Brazil is renowned for its hydroelectric power, which dominates the energy mix, the significance of natural gas as a flexible generation source is increasingly recognized, particularly during periods of drought when hydro resources may be limited.

Utilizing advanced gas turbine technology, the Celso Furtado plant is capable of rapidly adjusting its output to meet fluctuating energy demands, making it a vital asset in the Brazilian energy grid. This facility is strategically positioned within a vibrant energy cluster in the Bahia region, surrounded by several notable power plants. Not far from Celso Furtado is the Camaçari plant, which boasts a capacity of 346.803 MW and also operates on gas. Additionally, the Termobahia facility generates 186 MW, further highlighting the reliance on gas in the immediate area.

The presence of hydroelectric power is notable as well; the Pedra do Cavalo plant, located nearby, contributes 162 MW, showcasing the complementary role of hydro alongside gas generation in this region. On the oil front, the Muricy (Antiga Camaçari Muricy I) plant, with a capacity of 151.7 MW, and the Arembepe Power Plant at 150 MW, underlie the diverse fuel types that support the local grid. This intermingling of power sources allows for a more resilient energy infrastructure.

In the broader context of Brazil’s energy profile, the country heavily favors hydroelectric power, which accounts for a significant share of the energy mix. However, as the demand for electricity continues to grow, the contribution of gas plants like Celso Furtado becomes increasingly important, especially given that it is ranked as the 50th largest gas facility in Brazil.

Operated by a reputable entity, the facility stands as a testament to Brazil’s commitment to diversifying its energy generation portfolio while maintaining reliability. As energy demands evolve, the Celso Furtado plant is poised to play a significant role in supporting economic growth while also addressing environmental concerns through cleaner gas technology. The future of this power generation facility will likely focus on enhancing its efficiency and integrating with renewable sources, contributing to a sustainable energy future for Brazil.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.