Canada

Centrale Manic-1 — 184 MW Hydroelectric

Hydroelectric Renewable Verified

Centrale Manic-1 is a 184 MW hydro power plant located in Canada. View location, capacity, and technical details.

Capacity
184 MW

Installed

Commissioned
1969

Year online

Owner
Hydro-Québec

Operator

Location
49.19, -68.33

Coordinates

Insights

#181
largest in Canada
#1,542
largest Hydroelectric worldwide
#7,730
largest worldwide
1969
15 yrs older than avg
175
operated by Hydro-Québec
26
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
184 MW
Commissioned
1969
Status
Operational
Owner
Hydro-Québec
Country
Canada
Coordinates
49.191, -68.330
Wikipedia
Link

Estimated Carbon Footprint

Annual CO₂
15,474 t

tonnes / year

Lifetime CO₂
1,237,893 t

over ~80 yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

3,364
cars / year
2,063
homes / year
703,348
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

Centrale Manic-1, a hydroelectric power generation facility situated in Canada, commands a notable position as the 102nd largest hydro plant in the nation, delivering a capacity of 184 MW. This facility ranks 181st among 1,334 plants across Canada, a country where hydroelectric power dominates the energy landscape, representing a substantial portion of the overall capacity of 193,190 MW. Operated by Hydro-Québec, Centrale Manic-1 was commissioned in the mid-20th century, becoming a cornerstone of Quebec’s renewable energy portfolio. Nestled in the breathtaking Manicouagan region, it is part of a robust cluster of hydro plants, showcasing the region’s rich access to water resources. Within a 50 km radius, the impressive Jean-Lesage (Manic-2) plant leads with a capacity of 1,229 MW, followed closely by Outardes-3 at 1,026 MW and Outardes-2 at 523 MW. The presence of these powerful facilities highlights the competitive nature of hydroelectric generation in the area. In contrast, Centrale Manic-1’s output constitutes 0.10% of Canada’s total capacity, a reflection of the substantial contributions made by larger nearby operators. As Canada continues to focus on reducing greenhouse gas emissions, the role of plants like Centrale Manic-1 becomes increasingly critical. Hydro-Québec’s commitment to maintaining and upgrading this facility ensures its continued relevance in a rapidly evolving energy market. By promoting local renewable energy sources, Centrale Manic-1 not only contributes to the province’s energy needs but also supports economic development and environmental sustainability in the region.