BGR

PESHTERA — 135 MW Hydroelectric

Hydroelectric Renewable Verified

PESHTERA is a 135 MW hydro power plant located in Bulgaria. View location, capacity, and technical details.

Capacity
135 MW

Installed

Commissioned
1970

Year online

Owner
NPP PESHTERA

Operator

Location
42.01, 24.26

Coordinates

Insights

#13
largest in %s
#1,892
largest %s worldwide
#8,840
largest worldwide
1970
%d yrs older than avg
1
operated by %s
11
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
135 MW
Commissioned
1970
Status
Operational
Owner
NPP PESHTERA
Country
BGR
Coordinates
42.013, 24.257

Estimated Carbon Footprint

Annual CO₂
11,353 t

tonnes / year

Lifetime CO₂
908,237 t

over ~%d yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

2,468
cars / year
1,514
homes / year
516,044
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

PESHTERA, a hydroelectric power generation facility in Bulgaria, ranks as the 4th largest hydro plant in the country and holds a significant 1.46% share of the national total capacity of 9,252 MW. With a generation capacity of 135 MW, PESHTERA is an integral part of Bulgaria’s energy landscape where coal remains the dominant fuel. The facility utilizes traditional hydroelectric technology, harnessing the flow of water to generate electricity, which is critical in a country that is increasingly focusing on renewable energy sources. Located in a region rich with hydro resources, PESHTERA is close to several other prominent hydro plants, including PSCHAIRA GEN (864 MW), PSBELMEKEN (375 MW), SESTRIMO (240 MW), and MOMINA KLISU (120 MW). This clustering of hydroelectric facilities enhances the overall stability and reliability of the regional grid. Despite the presence of these other plants, PESHTERA stands out for its efficiency and contribution to the national grid. Bulgaria’s energy profile is evolving, with a growing emphasis on diversifying energy sources beyond coal. PESHTERA’s role in this transition underscores the importance of renewable energy in achieving national and EU climate goals. The plant, which has been operational for several years, is part of the larger vision of increasing Bulgaria’s renewable energy output. As the country navigates its path towards sustainability, PESHTERA will continue to be a pivotal player in the shift towards cleaner energy, supporting both economic growth and environmental stewardship.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.