SESTRIMO is a 240 MW hydro power plant located in Bulgaria. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 240 MW
- Commissioned
- 1970
- Status
- Operational
- Owner
- Bulgartransgaz
- Country
- BGR
- Coordinates
- 42.208, 23.916
Estimated Carbon Footprint
tonnes / year
over ~80 yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
PSCHAIRA GEN
Bulgaria · Hydroelectric
Bobov Dol power station
Bulgaria · Coal
PSBELMEKEN
Bulgaria · Hydroelectric
PESHTERA
Bulgaria · Hydroelectric
Momina Klisura Hydroelectric Power Station
Bulgaria · Hydroelectric
KARDZHALI
Bulgaria · Hydroelectric
About this plant
SESTRIMO ranks as the 8th largest power generation facility in Bulgaria and holds the 3rd position among the nation’s hydro plants, boasting a capacity of 240 MW. This facility accounts for a significant 2.59% of Bulgaria’s total capacity of 9,252 MW. As the country seeks to diversify its energy portfolio, SESTRIMO stands out not only for its output but also for its role in the broader energy landscape dominated by coal.
Harnessing the power of flowing water, SESTRIMO employs hydroelectric technology to generate electricity sustainably. This renewable energy source is crucial, especially in a country where coal remains the primary fuel for power generation. The facility’s output is vital for balancing Bulgaria’s energy demands, especially during peak consumption periods, where reliance on hydroelectric power can significantly reduce the environmental impact associated with fossil fuels.
In proximity to SESTRIMO, several other hydro plants contribute to the regional energy framework, including PSCHAIRA GEN with a substantial 864 MW capacity, and PSBELMEKEN, which generates 375 MW. These facilities, alongside smaller plants like PESHTERA and MOMINA KLISU, create a network of hydroelectric resources that enhance Bulgaria’s energy security and sustainability. The diversity in energy generation methods, including a solar plant like Solsbor, highlights the ongoing transition towards a more balanced energy mix in the region.
Bulgaria’s energy profile reveals a reliance on coal, yet facilities like SESTRIMO are pivotal in illustrating the potential for renewable energy alternatives. The average capacity of hydro plants in Bulgaria is lower than SESTRIMO, reinforcing its position as a key player in promoting hydroelectric power.
Operated by a local energy company, SESTRIMO has been providing electricity since its commissioning, which has positioned it as a staple in Bulgaria’s energy infrastructure. As the nation navigates its energy future, SESTRIMO’s significance will likely grow, particularly in the context of EU energy policies aimed at reducing carbon emissions. The facility not only contributes to local energy supply but also serves as an example of how renewable sources can be effectively integrated into a predominantly coal-based energy system.