Bersimis-2 — 869 MW Hydroelectric

Hydroelectric Renewable Verified

Bersimis-2 is a 869 MW hydro power plant located in Canada. View location, capacity, and technical details.

Capacity
869 MW

Installed

Commissioned
1965

Year online

Owner
Hydro-Québec

Operator

Location
49.18, -69.23

Coordinates

Insights

#54
largest in %s
#446
largest %s worldwide
#2,797
largest worldwide
1965
%d yrs older than avg
175
operated by %s
16
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
869 MW
Commissioned
1965
Status
Operational
Owner
Hydro-Québec
Country
Canada
Coordinates
49.175, -69.226

Estimated Carbon Footprint

Annual CO₂
73,079 t

tonnes / year

Lifetime CO₂
5.8M t

over ~%d yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

15,887
cars / year
9,744
homes / year
3.3M
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

Bersimis-2 is a significant hydroelectric power plant located in Quebec, Canada, with a total capacity of 869 megawatts (MW). Owned and operated by Hydro-Québec, it plays a crucial role in the province’s energy landscape, contributing to the overall hydroelectric generation that powers much of the region. As one of the largest hydroelectric facilities in Canada, Bersimis-2 harnesses the energy of flowing water to generate electricity, utilizing the gravitational force of water flowing from higher elevations to lower elevations to turn turbines. This process is a hallmark of hydroelectric power, which is a renewable energy source that is both sustainable and capable of producing large amounts of electricity with minimal emissions.

The plant is situated near the Bersimis River, which provides a consistent and reliable water source essential for hydroelectric generation. Hydroelectric power is renowned for its efficiency and low operational costs, as it relies on the natural water cycle. Bersimis-2 utilizes a reservoir-based system where water is stored and released as needed to generate electricity, allowing for flexibility in meeting demand. The turbine-generators at Bersimis-2 are designed to convert the kinetic energy of flowing water into mechanical energy, which is then transformed into electrical energy through electromagnetic induction.

In terms of environmental impact, hydroelectric power is often viewed as a cleaner alternative to fossil fuels, significantly reducing greenhouse gas emissions. However, the construction and operation of large dams and reservoirs can have ecological consequences, including habitat disruption for aquatic and terrestrial species. Hydro-Québec emphasizes the importance of environmental stewardship and sustainability in its operations, implementing measures to mitigate impacts on local ecosystems. These efforts include fish passage solutions and reforestation projects to support biodiversity in the areas affected by the plant.

Regionally, Bersimis-2 is vital to Quebec’s energy sector, which is predominantly powered by hydropower. This reliance on hydroelectricity not only ensures a stable and sustainable energy supply but also positions Quebec as a leader in renewable energy within Canada and globally. The plant supports local economies by providing jobs and contributing to the region’s infrastructure. Additionally, it plays a strategic role in balancing the electricity grid, especially during peak demand periods. Furthermore, Bersimis-2’s contribution to Quebec’s energy portfolio helps reduce reliance on non-renewable energy sources, fostering a cleaner energy future.

Overall, Bersimis-2 serves as a testament to the potential of hydroelectric power to meet energy needs while promoting sustainability and environmental responsibility. It stands as an integral component of Canada’s broader commitment to renewable energy and carbon reduction, reflecting the country’s dedication to a more sustainable energy sector.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.