Bioenergética Vale do Paracatu – BEVAP is a 55 MW biomass power plant located in Brazil. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Biomass
- Capacity
- 55 MW
- Commissioned
- 2011
- Status
- Operational
- Owner
- Bioenergética Vale do Paracatu
- Country
- Brazil
- Coordinates
- -17.058, -46.174
Estimated Carbon Footprint
tonnes / year
over ~%d yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
About this plant
Bioenergética Vale do Paracatu – BEVAP is a 55 MW biomass power plant located in Brazil, commissioned in 2011. It contributes to Brazil’s biomass energy production. This facility represents 0.43% of Brazil’s total biomass capacity of 12,644 MW across 425 plants.
Ranked #72 of 425 biomass plants in Brazil, Bioenergética Vale do Paracatu – BEVAP’s 55 MW is a small portion of the national biomass capacity. The largest biomass plant in Brazil is Klabin Celulose at 330 MW, making this facility 6 times smaller.
The nearest plants include Enervale (30 MW, Biomass). The facility is located in the state of Minas Gerais, approximately 400 km from the nearest major city, Belo Horizonte.
More %s plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.